{"title":"Focusing lenses for the 20-beam fusion laser: SHIVA","authors":"W. O'Neal","doi":"10.1364/cleos.1976.tha9","DOIUrl":null,"url":null,"abstract":"The SHIVA high energy laser facility now under construction at Lawrence Livermore Laboratory is a 20-arm, 1.06-µm Nd-glass laser system that can focus 20-30 TW of power nearly uniformly on a 300-1500-µm diam deuterium-tritium laser fusion pellet. The facility will be in operation in 1977 and should produce significant thermonuclear burn (fusion energy output = 1 % light energy input).","PeriodicalId":301658,"journal":{"name":"Conference on Laser and Electrooptical Systems","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1976-05-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference on Laser and Electrooptical Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1364/cleos.1976.tha9","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The SHIVA high energy laser facility now under construction at Lawrence Livermore Laboratory is a 20-arm, 1.06-µm Nd-glass laser system that can focus 20-30 TW of power nearly uniformly on a 300-1500-µm diam deuterium-tritium laser fusion pellet. The facility will be in operation in 1977 and should produce significant thermonuclear burn (fusion energy output = 1 % light energy input).