Measuring the Performance of the Completed Construction Projects through Users Committees: A Case of Khairahani Municipality, Chitwan, Nepal

Rajesh Koirala
{"title":"Measuring the Performance of the Completed Construction Projects through Users Committees: A Case of Khairahani Municipality, Chitwan, Nepal","authors":"Rajesh Koirala","doi":"10.36344/utecem.2023.v01i01.008","DOIUrl":null,"url":null,"abstract":"The projects in Nepal continuously faces issues of expected performance though at local level performance is strictly time bounded. To measure the performance of the completed construction projects through Users Committees in terms of execution time & cost contribution. The study was solely the project performance of the Municipality implementing through UCs of the 33 sites using Opinion survey, checklist survey. The primary and secondary data and information were collected through different tools as questionnaire survey, Key Informant’s Interview, Checklist and field visits. The Descriptive content analysis produces the measures of selected project performance. Overall performance of project executing by UCs was satisfactory. The projects through UCs have been completed within the budget. There is not time control mechanism in the projects since work schedule was not prepared and followed. Most of projects were completed on time of one year and all projects were completed within estimated cost. Due to less managerial and technical skill of UCs, inadequate supervision by the technicians, unavailability of skill persons at local levels and with no laboratory provision in the projects implementing through UCs, the quality of construction work could not be assured as QAP was not in use. For the transparency, the project information board is displayed at sites in the projects budgeting equal to or greater than 10 lakhs. Public Audits are also conducted in all the projects. The projects after the work completion have been examined and cleared within 30 days after completion. The empirical aspects of project implemented through users committee has been analyzed and pragmatic recommendations have been made for assuring effective performance.","PeriodicalId":199658,"journal":{"name":"Journal of UTEC Engineering Management","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of UTEC Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36344/utecem.2023.v01i01.008","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The projects in Nepal continuously faces issues of expected performance though at local level performance is strictly time bounded. To measure the performance of the completed construction projects through Users Committees in terms of execution time & cost contribution. The study was solely the project performance of the Municipality implementing through UCs of the 33 sites using Opinion survey, checklist survey. The primary and secondary data and information were collected through different tools as questionnaire survey, Key Informant’s Interview, Checklist and field visits. The Descriptive content analysis produces the measures of selected project performance. Overall performance of project executing by UCs was satisfactory. The projects through UCs have been completed within the budget. There is not time control mechanism in the projects since work schedule was not prepared and followed. Most of projects were completed on time of one year and all projects were completed within estimated cost. Due to less managerial and technical skill of UCs, inadequate supervision by the technicians, unavailability of skill persons at local levels and with no laboratory provision in the projects implementing through UCs, the quality of construction work could not be assured as QAP was not in use. For the transparency, the project information board is displayed at sites in the projects budgeting equal to or greater than 10 lakhs. Public Audits are also conducted in all the projects. The projects after the work completion have been examined and cleared within 30 days after completion. The empirical aspects of project implemented through users committee has been analyzed and pragmatic recommendations have been made for assuring effective performance.
通过用户委员会来衡量已完成建设项目的绩效:以尼泊尔奇旺省哈拉哈尼市为例
尼泊尔的项目一直面临着预期绩效的问题,尽管在地方一级的绩效有严格的时间限制。根据执行时间和成本贡献,通过用户委员会衡量已完成建设项目的绩效。该研究仅是市政府通过UCs对33个地点实施的项目绩效,采用了意见调查、清单调查。通过问卷调查、关键信息提供者访谈、检查表和实地访问等不同的工具收集第一手和第二手数据和信息。描述性内容分析产生选定项目绩效的度量。uc执行项目的总体表现是令人满意的。通过uc的项目已在预算范围内完成。项目没有时间控制机制,工作进度没有制定和执行。大部分项目在一年的时间内完成,所有项目都在预计成本内完成。由于联合工程中心的管理和技术水平较低,技术人员的监督不足,地方一级缺乏技术人员,以及通过联合工程中心实施的项目没有提供实验室,因此由于没有使用质量保证程序,建筑工程的质量无法得到保证。为了提高透明度,项目信息板显示在项目预算等于或大于100万的站点。所有项目亦会进行公共审计。竣工后的工程在竣工后30天内进行审批。对通过用户委员会实施的项目的经验方面进行了分析,并提出了切实可行的建议,以确保有效执行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信