{"title":"A MIP-based optimal operation scheduling of pumped-storage plant in the energy and regulation markets","authors":"S. J. Kazempour, A. Yousefi, K. Zare, M. P. Moghaddam, M. Haghifam, G. Yousefi","doi":"10.1109/UPEC.2008.4651465","DOIUrl":null,"url":null,"abstract":"This paper addresses the problem of optimal operation scheduling of an individual pumped-storage plant to participate in the energy and regulation markets simultaneously. The goal is achieving of the maximum expected profit when the plant participates in a day-ahead (DA) energy and regulation markets while all of the technical constraints are satisfied. This optimal operation scheduling problem is formulated and solved as a mixed integer programming (MIP) problem. Numerical results for a case study are discussed.","PeriodicalId":287461,"journal":{"name":"2008 43rd International Universities Power Engineering Conference","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-12-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"16","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 43rd International Universities Power Engineering Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/UPEC.2008.4651465","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 16

Abstract

This paper addresses the problem of optimal operation scheduling of an individual pumped-storage plant to participate in the energy and regulation markets simultaneously. The goal is achieving of the maximum expected profit when the plant participates in a day-ahead (DA) energy and regulation markets while all of the technical constraints are satisfied. This optimal operation scheduling problem is formulated and solved as a mixed integer programming (MIP) problem. Numerical results for a case study are discussed.
能源调控市场下基于mip的抽水蓄能电站最优调度
研究了单个抽水蓄能电站同时参与能源市场和调节市场的最优调度问题。目标是在满足所有技术限制的情况下,实现电厂参与前一天(DA)能源和监管市场时的最大预期利润。将该最优调度问题表述为混合整数规划(MIP)问题。讨论了一个实例的数值结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信