DCI-Free Based Downlink Prescheduling Scheme for Ultra-Reliable and Low Latency Communications

Man Dai, Ce Sun, Xinyi Wang, Ting-Way Liu
{"title":"DCI-Free Based Downlink Prescheduling Scheme for Ultra-Reliable and Low Latency Communications","authors":"Man Dai, Ce Sun, Xinyi Wang, Ting-Way Liu","doi":"10.1109/ICCT.2018.8600167","DOIUrl":null,"url":null,"abstract":"The fifth generation (5G) cellular network are divided into three key usage scenarios as enhanced mobile broadband, massive machine-type communications and ultra-reliable and low-latency communications (URLLC). To insure the low end-to-end delay and high reliability for users in URLLC, the overhead of physical downlink control channel (PDCCH) resource needs to be greatly increased during the scheduling process. In this paper, a downlink prescheduling scheme is proposed, where we don't need to transmit downlink control information (DCI). With this DCI-Free scheme, we can not only save PDCCH resource to support more users, but also simplify the signaling interaction to reduce the time delay. Simulation results show that the proposed scheme is able to support more users and decrease transmission delay without downlink control information in URLLC.","PeriodicalId":244952,"journal":{"name":"2018 IEEE 18th International Conference on Communication Technology (ICCT)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE 18th International Conference on Communication Technology (ICCT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCT.2018.8600167","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The fifth generation (5G) cellular network are divided into three key usage scenarios as enhanced mobile broadband, massive machine-type communications and ultra-reliable and low-latency communications (URLLC). To insure the low end-to-end delay and high reliability for users in URLLC, the overhead of physical downlink control channel (PDCCH) resource needs to be greatly increased during the scheduling process. In this paper, a downlink prescheduling scheme is proposed, where we don't need to transmit downlink control information (DCI). With this DCI-Free scheme, we can not only save PDCCH resource to support more users, but also simplify the signaling interaction to reduce the time delay. Simulation results show that the proposed scheme is able to support more users and decrease transmission delay without downlink control information in URLLC.
基于dci的超可靠低延迟通信下行链路预调度方案
第五代(5G)蜂窝网络分为增强型移动宽带、大规模机器类型通信和超可靠低延迟通信(URLLC)三个关键使用场景。为了保证URLLC中用户的端到端低延迟和高可靠性,在调度过程中需要大大增加物理下行链路控制通道(PDCCH)资源的开销。本文提出了一种不需要传输下行控制信息(DCI)的下行预调度方案。采用该DCI-Free方案,不仅可以节省PDCCH资源以支持更多的用户,而且可以简化信令交互以减少时间延迟。仿真结果表明,该方案在不需要URLLC下行控制信息的情况下,能够支持更多的用户,降低传输延迟。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信