Contract Breach and Payment for Environmental Services: A Case from the Kulekhani III Hydroelectric Project in Nepal

K. Dahal, Nabin Rai
{"title":"Contract Breach and Payment for Environmental Services: A Case from the Kulekhani III Hydroelectric Project in Nepal","authors":"K. Dahal, Nabin Rai","doi":"10.3126/HN.V19I0.15350","DOIUrl":null,"url":null,"abstract":"This study was conducted in 2014. The main objective of this study was to find out the cause of contract breach and Payment for Environmental Services (PES) of Kulekhani III Hydroelectric Project (Kulekhani III HEP). PES is a relatively new concept but it is important as it forces employers, contractors, and local residents of a hydropower project to take a fresh look to support a successful construction effort without causing unnecessary environmental damage. Research findings from responses of local people regarding PES programs, in their respective areas of Kulekhani III Hydroelectric Project have been presented. Hydropower construction is extremely complex works, reliant on a host of individual parties and processes to come together to bring a project to fruition. In every context of Nepal, there are additional challenges in terms of adhering to contractual terms and negotiating governmental and donor agencies requirements for proper construction of hydropower project. In the first half of this paper, it has been explored as a case study in the form of Kulekhani III HEP to provide a record of many overruns the contractor experienced. The project became delayed. There were many causes behind the project delay of Kulekhani III HEP. However, permit for tree clearance for access road and untimely payment for contractors are the major ones. HYDRO Nepal Journal Journal of Water, Energy and Environment Issue: 19 Page: 38-44","PeriodicalId":117617,"journal":{"name":"Hydro Nepal: Journal of Water, Energy and Environment","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-07-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Hydro Nepal: Journal of Water, Energy and Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3126/HN.V19I0.15350","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This study was conducted in 2014. The main objective of this study was to find out the cause of contract breach and Payment for Environmental Services (PES) of Kulekhani III Hydroelectric Project (Kulekhani III HEP). PES is a relatively new concept but it is important as it forces employers, contractors, and local residents of a hydropower project to take a fresh look to support a successful construction effort without causing unnecessary environmental damage. Research findings from responses of local people regarding PES programs, in their respective areas of Kulekhani III Hydroelectric Project have been presented. Hydropower construction is extremely complex works, reliant on a host of individual parties and processes to come together to bring a project to fruition. In every context of Nepal, there are additional challenges in terms of adhering to contractual terms and negotiating governmental and donor agencies requirements for proper construction of hydropower project. In the first half of this paper, it has been explored as a case study in the form of Kulekhani III HEP to provide a record of many overruns the contractor experienced. The project became delayed. There were many causes behind the project delay of Kulekhani III HEP. However, permit for tree clearance for access road and untimely payment for contractors are the major ones. HYDRO Nepal Journal Journal of Water, Energy and Environment Issue: 19 Page: 38-44
环境服务合同违约与支付:以尼泊尔库勒卡尼三世水电项目为例
这项研究于2014年进行。本研究的主要目的是找出库勒卡尼三世水电项目(库勒卡尼三世水电项目)的违约原因和环境服务付款(PES)。PES是一个相对较新的概念,但它很重要,因为它迫使水电项目的雇主、承包商和当地居民以新的眼光来支持成功的建设工作,而不会造成不必要的环境破坏。本文介绍了库列卡尼三世水电项目中当地居民对PES项目的反应。水电建设是一项极其复杂的工程,需要许多独立的各方和过程共同努力才能使项目取得成果。在尼泊尔的每一种情况下,在遵守合同条款和谈判政府和捐助机构对适当建设水电项目的要求方面都存在额外的挑战。在本文的前半部分,它以Kulekhani III HEP的形式作为案例研究进行了探讨,以提供承包商经历的许多超支的记录。这个项目被推迟了。库列哈尼III期HEP项目延期的原因是多方面的。然而,主要的问题是批准砍伐树木以兴建道路,以及未及时向承建商付款。水电尼泊尔杂志水、能源和环境杂志第19期,第38-44页
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信