BIM for lean building surveying services

Ali Mahmood, Sepehr Abrishami
{"title":"BIM for lean building surveying services","authors":"Ali Mahmood, Sepehr Abrishami","doi":"10.1108/ci-11-2019-0131","DOIUrl":null,"url":null,"abstract":"The purpose of this paper is to determine whether the implementation of building information modelling (BIM) concepts of the various processes involved in building surveying practice can lead to a reduction in waste. In turn leading to a synergy between BIM functionalities and lean production concepts.,To verify and validate the existence of this synergy between the two methods in building surveying, evidences were gathered from previous literature that supports these interactions. Next, a questionnaire was conducted for the purpose of identifying new interactions and providing further evidence to support existing interactions. Finally, based on the findings from previous literature and the results of the questionnaire, an interaction matrix was constructed linking the two concepts with the relevant evidence found.,The results of the questionnaire show that the BIM functionality with the highest interactions, maintenance of information integrity, had a high correlation with the reduction of variability, cycle time, batch size and promoting standardization of value flow. 4 D model-based scheduling, the second highest functionality, showed a high correlation with the reduction of variability, cycle time, batch size and an increase in the use of visual management. Finally, the results of the interaction matrix between the two concepts showed that the BIM functionalities with the most interactions were maintenance of information integrity, visualization of form and the automated generation of models and documents. The lean principles with the most interactions were reducing variability, cycle time, batch size as well as “enables visual management”. While most of these interactions were positive, negative interactions were also observed. These negative interactions were due to the fact that the level of competency and knowledge in BIM for building surveyors is at reduced levels which can lead to increased human errors.,The significance of this study is to provide the basis for building surveying organizations who wish to implement BIM and how this would lead to a synergy between BIM functionalities and lean principles. Both positive and negative interactions were considered to provide these organizations with different options for waste elimination.","PeriodicalId":221945,"journal":{"name":"Construction Innovation: Information, Process, Management","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-05-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Innovation: Information, Process, Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/ci-11-2019-0131","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

Abstract

The purpose of this paper is to determine whether the implementation of building information modelling (BIM) concepts of the various processes involved in building surveying practice can lead to a reduction in waste. In turn leading to a synergy between BIM functionalities and lean production concepts.,To verify and validate the existence of this synergy between the two methods in building surveying, evidences were gathered from previous literature that supports these interactions. Next, a questionnaire was conducted for the purpose of identifying new interactions and providing further evidence to support existing interactions. Finally, based on the findings from previous literature and the results of the questionnaire, an interaction matrix was constructed linking the two concepts with the relevant evidence found.,The results of the questionnaire show that the BIM functionality with the highest interactions, maintenance of information integrity, had a high correlation with the reduction of variability, cycle time, batch size and promoting standardization of value flow. 4 D model-based scheduling, the second highest functionality, showed a high correlation with the reduction of variability, cycle time, batch size and an increase in the use of visual management. Finally, the results of the interaction matrix between the two concepts showed that the BIM functionalities with the most interactions were maintenance of information integrity, visualization of form and the automated generation of models and documents. The lean principles with the most interactions were reducing variability, cycle time, batch size as well as “enables visual management”. While most of these interactions were positive, negative interactions were also observed. These negative interactions were due to the fact that the level of competency and knowledge in BIM for building surveyors is at reduced levels which can lead to increased human errors.,The significance of this study is to provide the basis for building surveying organizations who wish to implement BIM and how this would lead to a synergy between BIM functionalities and lean principles. Both positive and negative interactions were considered to provide these organizations with different options for waste elimination.
BIM用于精益建筑测量服务
本文的目的是确定在建筑测量实践中涉及的各种过程中实施建筑信息模型(BIM)概念是否可以减少浪费。从而导致BIM功能和精益生产概念之间的协同作用。为了验证这两种方法在建筑测量中的协同作用,我们从以前的文献中收集了支持这些相互作用的证据。接下来,进行问卷调查,以确定新的互动,并提供进一步的证据来支持现有的互动。最后,基于以往文献的发现和问卷调查的结果,我们构建了一个交互矩阵,将这两个概念与所发现的相关证据联系起来。问卷调查结果显示,交互作用最高的BIM功能,维护信息完整性,与减少可变性、周期时间、批量大小和促进价值流标准化具有高度相关性。基于4d模型的调度是第二高的功能,与可变性的减少、周期时间、批量大小和可视化管理使用的增加高度相关。最后,两个概念之间的交互矩阵结果显示,交互最多的BIM功能是信息完整性维护、表单可视化以及模型和文档的自动生成。相互作用最大的精益原则是减少可变性、周期时间、批量大小以及“实现可视化管理”。虽然这些相互作用大多是积极的,但也观察到消极的相互作用。这些负面的互动是由于建筑测量师在BIM中的能力和知识水平处于较低的水平,这可能导致人为错误的增加。本研究的意义在于为希望实施BIM的建筑测量组织提供基础,以及这将如何导致BIM功能与精益原则之间的协同作用。考虑了积极和消极的相互作用,为这些组织提供了消除废物的不同选择。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信