Questões relevantes e polêmicas envolvendo os contratos administrativos de obras públicas

A. Barbosa
{"title":"Questões relevantes e polêmicas envolvendo os contratos administrativos de obras públicas","authors":"A. Barbosa","doi":"10.52028/rpgmnit.v1i1.02","DOIUrl":null,"url":null,"abstract":"The purpose of this article is to expound controversial aspects and aspects of high practical relevance, specifically related to the extension and amendment of engineering work contracts entered into by the Public Administration. The first topic to be addressed concerns the duration of contracts of this kind. Following on, will be discussed the controversy involving the (lack of) need of entering into an amendment for the purpose of extension of the term of effectiveness. The practical consequences of an eventual lack of formalization of an amendment are also examined. And at last, the matter related to legal possibility to be made quantitative amendments in contracts by global price will be analyzed.","PeriodicalId":346094,"journal":{"name":"Revista da Procuradoria Geral do Município de Niterói","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-06-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Revista da Procuradoria Geral do Município de Niterói","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.52028/rpgmnit.v1i1.02","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The purpose of this article is to expound controversial aspects and aspects of high practical relevance, specifically related to the extension and amendment of engineering work contracts entered into by the Public Administration. The first topic to be addressed concerns the duration of contracts of this kind. Following on, will be discussed the controversy involving the (lack of) need of entering into an amendment for the purpose of extension of the term of effectiveness. The practical consequences of an eventual lack of formalization of an amendment are also examined. And at last, the matter related to legal possibility to be made quantitative amendments in contracts by global price will be analyzed.
涉及公共工程行政合同的相关和有争议的问题
本文的目的是阐述有争议的方面和高度实际相关性的方面,特别是与公共行政部门签订的工程工作合同的延长和修订有关。要讨论的第一个专题涉及这类合同的期限。接下来,将讨论是否有必要为延长有效期限而订立修正案的争议。最后还审查了一项修正案最终没有正式化的实际后果。最后分析了全球价格对合同进行定量修正的法律可能性问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信