Anticipation of Problems in Innovative Projects Based on OTSM-TRIZ

Christopher Nikulin, C. Domínguez, R. Stegmaier, Sabrina Estefania Nino, P. Viveros, N. Becattini
{"title":"Anticipation of Problems in Innovative Projects Based on OTSM-TRIZ","authors":"Christopher Nikulin, C. Domínguez, R. Stegmaier, Sabrina Estefania Nino, P. Viveros, N. Becattini","doi":"10.4018/978-1-5225-7152-0.CH010","DOIUrl":null,"url":null,"abstract":"In this chapter, an integrated proposal is described to guide analysts and developers in identifying and selecting optimal alternative solutions in innovative projects. The integration is inspired by the theory of inventive problem solving, and specifically the recent evolution of the OTSM-TRIZ with a body of knowledge of risk analysis assessment. The authors propose a solution assessment indicator based on TRIZ-resources to anticipate a lack of resources when solutions are proposed. The solution assessment considers both risk assessment logic for evaluation and TRIZ resources for parameter classification and categorization. Finally, the solution assessment indicator aims to anticipate potential uncertainty by considering both qualitative and quantitative teamwork approaches. Moreover, this chapter presents a case study that involves a group of young designers and engineers working on a gripper design project, where the designers must develop a new product for a university laboratory.","PeriodicalId":383647,"journal":{"name":"Advances in Human and Social Aspects of Technology","volume":"136 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advances in Human and Social Aspects of Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4018/978-1-5225-7152-0.CH010","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In this chapter, an integrated proposal is described to guide analysts and developers in identifying and selecting optimal alternative solutions in innovative projects. The integration is inspired by the theory of inventive problem solving, and specifically the recent evolution of the OTSM-TRIZ with a body of knowledge of risk analysis assessment. The authors propose a solution assessment indicator based on TRIZ-resources to anticipate a lack of resources when solutions are proposed. The solution assessment considers both risk assessment logic for evaluation and TRIZ resources for parameter classification and categorization. Finally, the solution assessment indicator aims to anticipate potential uncertainty by considering both qualitative and quantitative teamwork approaches. Moreover, this chapter presents a case study that involves a group of young designers and engineers working on a gripper design project, where the designers must develop a new product for a university laboratory.
基于OTSM-TRIZ的创新项目问题预测
在本章中,描述了一个集成的建议,以指导分析师和开发人员在创新项目中识别和选择最佳的替代解决方案。这种集成受到创造性问题解决理论的启发,特别是OTSM-TRIZ最近的发展,其中包含了风险分析评估的知识体系。作者提出了一个基于trz资源的方案评估指标,以便在提出方案时预测资源的缺乏。方案评估既考虑风险评估逻辑进行评估,又考虑TRIZ资源进行参数分类和分类。最后,解决方案评估指标旨在通过考虑定性和定量团队合作方法来预测潜在的不确定性。此外,本章提出了一个案例研究,涉及一群年轻的设计师和工程师在一个夹具设计项目中工作,其中设计师必须为大学实验室开发一种新产品。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信