{"title":"The New Storstrøm Bridge – Prestressed Box Girder Design","authors":"Luca Cargnino, E. Po","doi":"10.2749/prague.2022.0112","DOIUrl":null,"url":null,"abstract":"The New Storstrøm Bridge is a 3.8 km long combined rail and road bridge currently under construction. It will be Denmark’s third longest bridge. It comprises two approach viaducts with 44 spans, typically 80 m long, and a single-tower cable stayed bridge located centrally within the strait crossing, with two 160 m navigational spans. The 25 m wide deck is a prestressed concrete box girder with a unique asymmetric cross section and wide cantilevers. It carries a two-track, high speed railway and a carriageway comprising a two-lane road and a combined pedestrian-cycle. The tight construction schedule imposed to the Design & Build Contract requires the use of full prefabrication of the box girder. A span-by-span construction method based on the erection of typically 73 m-long precast segments is adopted. This paper presents the main challenges of the box girder design due to the construction method, the unusual cross-section and the heavily asymmetric traffic loading.","PeriodicalId":168532,"journal":{"name":"IABSE Symposium, Prague 2022: Challenges for Existing and Oncoming Structures","volume":"42 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IABSE Symposium, Prague 2022: Challenges for Existing and Oncoming Structures","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2749/prague.2022.0112","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
The New Storstrøm Bridge is a 3.8 km long combined rail and road bridge currently under construction. It will be Denmark’s third longest bridge. It comprises two approach viaducts with 44 spans, typically 80 m long, and a single-tower cable stayed bridge located centrally within the strait crossing, with two 160 m navigational spans. The 25 m wide deck is a prestressed concrete box girder with a unique asymmetric cross section and wide cantilevers. It carries a two-track, high speed railway and a carriageway comprising a two-lane road and a combined pedestrian-cycle. The tight construction schedule imposed to the Design & Build Contract requires the use of full prefabrication of the box girder. A span-by-span construction method based on the erection of typically 73 m-long precast segments is adopted. This paper presents the main challenges of the box girder design due to the construction method, the unusual cross-section and the heavily asymmetric traffic loading.