Asynchronous parallel paint systems: sequencing and control issues in JIT environment

I. James, S. Kekre, N. Lafond
{"title":"Asynchronous parallel paint systems: sequencing and control issues in JIT environment","authors":"I. James, S. Kekre, N. Lafond","doi":"10.1109/CIM.1988.5426","DOIUrl":null,"url":null,"abstract":"The asynchronous parallel painting of vehicles in modern vehicle assembly facilities provides the flexibility to handle variations in mix, quality, and equipment uptimes. However, this results in an unpredictable output sequence of vehicles leading to problems in material flow, especially in plants that use just-in-time (JIT) parts delivery. A flow model is developed that captures the relationship between processing time, systems throughput, loading mix, system size, and output sequence number. The model provides several insights for design and configuration of a plant and aids in setting operating policies. It was validated by performing spectral analysis using plant data. The model is extended to handle dynamic loading and updates on controls.<<ETX>>","PeriodicalId":334994,"journal":{"name":"[Proceedings] 1988 International Conference on Computer Integrated Manufacturing","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1988-05-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"[Proceedings] 1988 International Conference on Computer Integrated Manufacturing","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CIM.1988.5426","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

The asynchronous parallel painting of vehicles in modern vehicle assembly facilities provides the flexibility to handle variations in mix, quality, and equipment uptimes. However, this results in an unpredictable output sequence of vehicles leading to problems in material flow, especially in plants that use just-in-time (JIT) parts delivery. A flow model is developed that captures the relationship between processing time, systems throughput, loading mix, system size, and output sequence number. The model provides several insights for design and configuration of a plant and aids in setting operating policies. It was validated by performing spectral analysis using plant data. The model is extended to handle dynamic loading and updates on controls.<>
异步并行喷漆系统:JIT环境下的排序和控制问题
在现代汽车装配设施中,车辆的异步并行涂装提供了处理混合、质量和设备正常运行时间变化的灵活性。然而,这导致车辆的输出序列不可预测,从而导致物料流问题,特别是在使用准时制(JIT)零件交付的工厂。开发了一个流模型,该模型捕获了处理时间、系统吞吐量、负载组合、系统大小和输出序列号之间的关系。该模型为工厂的设计和配置提供了一些见解,并有助于制定操作策略。利用植物数据进行光谱分析,验证了该方法的有效性。该模型被扩展到处理控件的动态加载和更新。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信