{"title":"Uncertainty evaluation of the PTB primary clocks CS3 and CS4","authors":"A. Bauch, B. Fischer, T. Heindorff, R. Schroder","doi":"10.1109/CPEM.1994.333419","DOIUrl":null,"url":null,"abstract":"At the PTB two primary cesium atomic clocks with a vertical atomic beam were constructed and put into operation during the last years. The contributions to the total uncertainty traditionally considered as being of relevance were determined. The observation of the clock data however, has revealed changes in the mean frequency slightly larger than the combined uncertainty of the clocks. This dilemma makes refined studies inevitable.<<ETX>>","PeriodicalId":388647,"journal":{"name":"Proceedings of Conference on Precision Electromagnetic Measurements Digest","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1994-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of Conference on Precision Electromagnetic Measurements Digest","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CPEM.1994.333419","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
At the PTB two primary cesium atomic clocks with a vertical atomic beam were constructed and put into operation during the last years. The contributions to the total uncertainty traditionally considered as being of relevance were determined. The observation of the clock data however, has revealed changes in the mean frequency slightly larger than the combined uncertainty of the clocks. This dilemma makes refined studies inevitable.<>