A practical method for tranmission expansion planning

T. Tran, V. Tran, PhanTu Vu, Jeongje Park, Jaeseok Choi
{"title":"A practical method for tranmission expansion planning","authors":"T. Tran, V. Tran, PhanTu Vu, Jeongje Park, Jaeseok Choi","doi":"10.1109/TD-ASIA.2009.5356814","DOIUrl":null,"url":null,"abstract":"This paper proposes a practical method for transmission expansion planning. This method suggests the optimization grid planning by integer programming using branch and bound method, which utilizes a network flow approach and the maximum flow-minimum cut set theorem to minimize investment budget of transmission line construction and subject to deterministic criterion using a program Cmexp. For. The timing priority of new line construction is determined on the comparison of probabilistic reliability indices of each new system using TRELSS 6.2 program. The new power system is verified an operation conditions as like as the power system stability by using a PowerWorld program. The proposed method has been tested on IEEE-MRTS.","PeriodicalId":131589,"journal":{"name":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TD-ASIA.2009.5356814","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This paper proposes a practical method for transmission expansion planning. This method suggests the optimization grid planning by integer programming using branch and bound method, which utilizes a network flow approach and the maximum flow-minimum cut set theorem to minimize investment budget of transmission line construction and subject to deterministic criterion using a program Cmexp. For. The timing priority of new line construction is determined on the comparison of probabilistic reliability indices of each new system using TRELSS 6.2 program. The new power system is verified an operation conditions as like as the power system stability by using a PowerWorld program. The proposed method has been tested on IEEE-MRTS.
一种实用的输变电规划方法
本文提出了一种实用的输电扩容规划方法。该方法采用分支定界法,利用网络流法和最大流-最小割集定理使输电线路建设投资预算最小化,并服从程序Cmexp的确定性准则,采用整数规划方法进行电网优化规划。对。利用TRELSS 6.2程序对各新系统的概率可靠性指标进行比较,确定新线建设的时序优先级。利用PowerWorld程序验证了新电力系统的运行条件和系统稳定性。该方法已在IEEE-MRTS上进行了测试。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信