Constraining Factors in Realizing Strategic Plan Objectives by Local Authorities in Zambia: Case of Kitwe City Council

Thomas Taylor, Francis Muwowo, Z. Phiri
{"title":"Constraining Factors in Realizing Strategic Plan Objectives by Local Authorities in Zambia: Case of Kitwe City Council","authors":"Thomas Taylor, Francis Muwowo, Z. Phiri","doi":"10.25069/SPMJ.455404","DOIUrl":null,"url":null,"abstract":"The purpose of the study was to determine the constraining factors in realizing strategic plan objective by Kitwe City Council in Zambia. This was a case study that focused on the strategic plan of the Council for the period 2012 to 2016. The research used qualitative methodology that also employed grounded theory methods during the data collection, i.e., interviews and documentary reviews. Content analysis was the main analytical tool utilized for the analysis. The results of the study indicated that, the City Council had an ambitious plan which was unrealistic in the sense that within the plan period, too many priority projects were incorporated in the plan. Furthermore, the implementation of the plan lacked committed leadership drive and visioning at the departmental level of the institution, lacked ownership of the strategic plan document, inadequate financial resources generated by the Council to finance the projects, non-coordination and harmonization of strategies in implementation of strategic activities by the departments within the \\council, political interference and non-collaboration of potential cooperating partners affected the implementation of the plan, hence achieving virtually insignificant proportion of the expected outcomes of the strategic objectives. The findings of the study provide significant and valuable information to all management of Local Authorities in Zambia and perhaps in the developing economies that perceive that formulation of strategic plan is significant to improve the service delivery to their citizenry under their areas of jurisdiction.","PeriodicalId":395315,"journal":{"name":"Strategic Public Management Journal","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Strategic Public Management Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25069/SPMJ.455404","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

The purpose of the study was to determine the constraining factors in realizing strategic plan objective by Kitwe City Council in Zambia. This was a case study that focused on the strategic plan of the Council for the period 2012 to 2016. The research used qualitative methodology that also employed grounded theory methods during the data collection, i.e., interviews and documentary reviews. Content analysis was the main analytical tool utilized for the analysis. The results of the study indicated that, the City Council had an ambitious plan which was unrealistic in the sense that within the plan period, too many priority projects were incorporated in the plan. Furthermore, the implementation of the plan lacked committed leadership drive and visioning at the departmental level of the institution, lacked ownership of the strategic plan document, inadequate financial resources generated by the Council to finance the projects, non-coordination and harmonization of strategies in implementation of strategic activities by the departments within the \council, political interference and non-collaboration of potential cooperating partners affected the implementation of the plan, hence achieving virtually insignificant proportion of the expected outcomes of the strategic objectives. The findings of the study provide significant and valuable information to all management of Local Authorities in Zambia and perhaps in the developing economies that perceive that formulation of strategic plan is significant to improve the service delivery to their citizenry under their areas of jurisdiction.
赞比亚地方当局实现战略规划目标的制约因素:以基泰市议会为例
本研究的目的是确定赞比亚基特韦市议会实现战略规划目标的制约因素。这是一个案例研究,重点是理事会2012年至2016年期间的战略计划。本研究采用定性方法,在数据收集过程中也采用扎根理论方法,即访谈和文献综述。内容分析是进行分析的主要分析工具。研究结果表明,市议会制定了一项雄心勃勃的计划,但这一计划是不现实的,因为在计划期间,计划中纳入了太多的优先项目。此外,该计划的执行在该机构的部门一级缺乏坚定的领导动力和远见,缺乏战略计划文件的所有权,理事会为资助项目提供的财政资源不足,理事会各部门在执行战略活动时不协调和统一战略。政治干预和潜在合作伙伴的不合作影响了该计划的执行,因此在战略目标的预期成果中所占的比例几乎微不足道。这项研究的结果为赞比亚地方当局的所有管理人员提供了重要和有价值的资料,也许也为发展中经济体的所有管理人员提供了资料,这些管理人员认为制订战略计划对于改善向其管辖范围内的公民提供服务具有重要意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信