Partial Discharges Measurements for Condition Monitoring and Diagnosis of Power Transformers: A Review

J. M. Rodríguez-Serna, Ricardo Albarracín‐Sánchez, F. Garnacho, F. Álvarez, J. Ortego
{"title":"Partial Discharges Measurements for Condition Monitoring and Diagnosis of Power Transformers: A Review","authors":"J. M. Rodríguez-Serna, Ricardo Albarracín‐Sánchez, F. Garnacho, F. Álvarez, J. Ortego","doi":"10.23919/ARWtr.2019.8930183","DOIUrl":null,"url":null,"abstract":"Power transformers are key electrical assets in power networks. Their lifetimes are estimated to be around 40 years if they are properly maintained. However, thermal, electrical and mechanical stresses can cause the apparition of partial discharge (PD) activity in the insulation system that can lead to its degradation. Thus, the presence of PD activity can be considered as indicator of failure. Conventional PD acquisitions can be done in accordance with IEC-60270 and IEC-60076-3 standards. In the last decades, unconventional methods, depicted in the IEC-TS-62478 standard, based on acoustic and electromagnetic measurements are being combined with the conventional ones for monitoring power transformers identifying and localizing PD sources. In this paper, the necessity of PD monitoring in power transformers is highlighted and a review of different methods for measuring PD is featured. Besides, some technological trends are depicted. Finally, PD modelling is presented as a promising compliment for PD diagnosis.","PeriodicalId":117389,"journal":{"name":"2019 6th International Advanced Research Workshop on Transformers (ARWtr)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 6th International Advanced Research Workshop on Transformers (ARWtr)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23919/ARWtr.2019.8930183","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

Abstract

Power transformers are key electrical assets in power networks. Their lifetimes are estimated to be around 40 years if they are properly maintained. However, thermal, electrical and mechanical stresses can cause the apparition of partial discharge (PD) activity in the insulation system that can lead to its degradation. Thus, the presence of PD activity can be considered as indicator of failure. Conventional PD acquisitions can be done in accordance with IEC-60270 and IEC-60076-3 standards. In the last decades, unconventional methods, depicted in the IEC-TS-62478 standard, based on acoustic and electromagnetic measurements are being combined with the conventional ones for monitoring power transformers identifying and localizing PD sources. In this paper, the necessity of PD monitoring in power transformers is highlighted and a review of different methods for measuring PD is featured. Besides, some technological trends are depicted. Finally, PD modelling is presented as a promising compliment for PD diagnosis.
电力变压器局部放电监测与诊断研究进展
电力变压器是电网中的关键电力资产。如果保养得当,它们的寿命估计在40年左右。然而,热、电和机械应力会导致绝缘系统局部放电(PD)活动的出现,从而导致绝缘系统的退化。因此,PD活性的存在可以被认为是失败的指标。常规PD采集可按照IEC-60270和IEC-60076-3标准进行。在过去的几十年里,IEC-TS-62478标准中描述的基于声学和电磁测量的非常规方法正在与传统方法相结合,用于监测电力变压器,识别和定位PD源。本文强调了电力变压器局部放电监测的必要性,并对各种局部放电测量方法进行了综述。此外,还描述了一些技术趋势。最后,PD建模被认为是PD诊断的一个有希望的补充。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信