{"title":"Investing in Renewable Energy: Decarbonizing Power Plant Industry with the Feasibility Study of Mini-Hydro Project","authors":"E. Saratian","doi":"10.55927/fjas.v2i7.5315","DOIUrl":null,"url":null,"abstract":"This study aims to analyze and determine the feasibility study of a mini-hydro project with a capacity of 2 x 3 MW in West Java, Indonesia. This research is a qualitative research with a case study approach. The selection of participants in this study used a purposive sampling technique, where the data collected was obtained from primary and secondary data. The data analysis used in this research is cash flow projection evaluation by calculating Payback-Period (PBP), Net Present Value (NPV) and Internal Rate of Return (IRR). Based on the calculations that have been made, the investment feasibility indicators for the projects to be funded are the Payback Period of 8 years and 3 months, the NPV of IDR 3,977 million and the IRR of 11.22% so that the mini-hydro project is said to be feasible to run.","PeriodicalId":417166,"journal":{"name":"Formosa Journal of Applied Sciences","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Formosa Journal of Applied Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55927/fjas.v2i7.5315","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

This study aims to analyze and determine the feasibility study of a mini-hydro project with a capacity of 2 x 3 MW in West Java, Indonesia. This research is a qualitative research with a case study approach. The selection of participants in this study used a purposive sampling technique, where the data collected was obtained from primary and secondary data. The data analysis used in this research is cash flow projection evaluation by calculating Payback-Period (PBP), Net Present Value (NPV) and Internal Rate of Return (IRR). Based on the calculations that have been made, the investment feasibility indicators for the projects to be funded are the Payback Period of 8 years and 3 months, the NPV of IDR 3,977 million and the IRR of 11.22% so that the mini-hydro project is said to be feasible to run.
投资可再生能源:以小型水电项目为例的电厂脱碳研究
本研究旨在分析和确定印度尼西亚西爪哇一个容量为2 × 3兆瓦的小型水电项目的可行性研究。本研究采用案例研究方法进行定性研究。本研究中参与者的选择采用了有目的的抽样技术,收集的数据来自主要和次要数据。本研究使用的数据分析是通过计算投资回收期(PBP)、净现值(NPV)和内部收益率(IRR)进行现金流量预测评估。经计算,拟投资项目投资可行性指标为投资回收期8年3个月,净现值39.77亿印尼卢比,内部收益率11.22%,认为该小型水电项目具有可行性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信