{"title":"Transient stability analysis of Gadong Power Station","authors":"M. Salam, H. Morsidi, N. Ottman","doi":"10.1049/CP.2009.1750","DOIUrl":null,"url":null,"abstract":"Transient stability analysis is very important to find the behavior of the synchronous machines under faulted condition. In this paper, IPSA simulation software is used to study the transient stability analysis of Gadong power station. Three-phase faults are considered at the busbar 1415LPS and 2829GPS1 with different fault clearing times. From the location at 1415LPS busbar, it is found that the generators of the Gadong I power station are stable for the fault clearing times of 0.1 s and 0.3 s and becomes unstable for the fault clearing time of 0.6 s and 0.7 s. At the other location of the busbar 2829GPS1, the generators of the Gadong I power station becomes unstable for the fault clearing time 0.7 s.","PeriodicalId":402202,"journal":{"name":"2009 International Conference on Electric Power and Energy Conversion Systems, (EPECS)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 International Conference on Electric Power and Energy Conversion Systems, (EPECS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1049/CP.2009.1750","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Transient stability analysis is very important to find the behavior of the synchronous machines under faulted condition. In this paper, IPSA simulation software is used to study the transient stability analysis of Gadong power station. Three-phase faults are considered at the busbar 1415LPS and 2829GPS1 with different fault clearing times. From the location at 1415LPS busbar, it is found that the generators of the Gadong I power station are stable for the fault clearing times of 0.1 s and 0.3 s and becomes unstable for the fault clearing time of 0.6 s and 0.7 s. At the other location of the busbar 2829GPS1, the generators of the Gadong I power station becomes unstable for the fault clearing time 0.7 s.
广东电站暂态稳定分析
暂态稳定分析对于发现同步电机在故障状态下的运行状态是非常重要的。本文采用IPSA仿真软件对加东电站进行暂态稳定分析研究。母线1415LPS和2829GPS1考虑三相故障,故障清除时间不同。从1415LPS母线位置可知,加东1电站发电机在故障清除时间为0.1 s和0.3 s时是稳定的,在故障清除时间为0.6 s和0.7 s时变得不稳定。在母线2829GPS1的另一位置,在故障清除时间0.7 s内,加东1电站发电机不稳定。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信