Coordination Analysis of Over Current Protection Using ETAP Software: A Case Study in PT Indocement Tunggal Prakarsa Tarjun, Kotabaru, South Kalimantan

Adi Setiawan, R. Syahputra, A. N. N. Chamim, Jeckson Jeckson
{"title":"Coordination Analysis of Over Current Protection Using ETAP Software: A Case Study in PT Indocement Tunggal Prakarsa Tarjun, Kotabaru, South Kalimantan","authors":"Adi Setiawan, R. Syahputra, A. N. N. Chamim, Jeckson Jeckson","doi":"10.18196/jet.3151","DOIUrl":null,"url":null,"abstract":"PT Indocement Tunggal Prakarsa Tarjun, Tbk Plant 12, is the largest cement company in Kalimantan. The growing industrial world in the field of cement that is very rapidly will significantly affect the speed of the economy. Thus the increase in the field of electricity will be more felt. PT Indocement Tunggal Prakarsa Plant 12, located in South Kalimantan, requires a reliable electrical system, both in terms of its power supply, in terms of backup of installed electrical systems, as well as safeguards that meet the electricity standards. In the short-circuit settlement is not desired, then the protection of the current relays more with proper coordination protection and reliable required. The coordination of the protection of the current relay is more necessary than the others in order to occur short circuit occurs in the field. No widespread damage occurred in its electricity and existing industrial equipment. To maintain the condition of the electric power system in optimum absence, a re-study of the coordination of current relational protection in PT Indocement Tunggal Prakarsa, Tbk Plant 12. This final project will discuss coordination analysis of overcurrent relay protection at PT. Indocement Tunggal Prakarsa, Tbk. In analyzing the coordination of overcurrent protection, then using several methods in a more coordinated way with coordination protection resetting using ETAP software. They are also resetting coordination protection overcurrent relays using manual calculations. After making the comparison, it can be seen as more current relay protection installed in the field. Some do not work well. It is pronounced in the work of existence, which does not match the standard ie, 0.2 0.35 seconds from the IEEE.","PeriodicalId":402105,"journal":{"name":"Journal of Electrical Technology UMY","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Electrical Technology UMY","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18196/jet.3151","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

PT Indocement Tunggal Prakarsa Tarjun, Tbk Plant 12, is the largest cement company in Kalimantan. The growing industrial world in the field of cement that is very rapidly will significantly affect the speed of the economy. Thus the increase in the field of electricity will be more felt. PT Indocement Tunggal Prakarsa Plant 12, located in South Kalimantan, requires a reliable electrical system, both in terms of its power supply, in terms of backup of installed electrical systems, as well as safeguards that meet the electricity standards. In the short-circuit settlement is not desired, then the protection of the current relays more with proper coordination protection and reliable required. The coordination of the protection of the current relay is more necessary than the others in order to occur short circuit occurs in the field. No widespread damage occurred in its electricity and existing industrial equipment. To maintain the condition of the electric power system in optimum absence, a re-study of the coordination of current relational protection in PT Indocement Tunggal Prakarsa, Tbk Plant 12. This final project will discuss coordination analysis of overcurrent relay protection at PT. Indocement Tunggal Prakarsa, Tbk. In analyzing the coordination of overcurrent protection, then using several methods in a more coordinated way with coordination protection resetting using ETAP software. They are also resetting coordination protection overcurrent relays using manual calculations. After making the comparison, it can be seen as more current relay protection installed in the field. Some do not work well. It is pronounced in the work of existence, which does not match the standard ie, 0.2 0.35 seconds from the IEEE.
基于ETAP软件的过电流保护协调分析——以南加里曼丹Kotabaru, Tunggal Prakarsa Tarjun的PT文件为例
PT Indocement Tunggal Prakarsa Tarjun, Tbk第12厂,是加里曼丹最大的水泥公司。世界工业在水泥领域的发展非常迅速,将显著影响经济的发展速度。因此,电场的增加将更加明显。位于南加里曼丹的东加尔普拉卡尔萨12号工厂需要一个可靠的电力系统,无论是在其电力供应方面,还是在已安装的电力系统的备份方面,以及符合电力标准的保障措施方面。在短路沉降不理想的情况下,则对电流继电器的保护更具有适当的协调保护和可靠的要求。为了防止现场发生短路,电流继电器的协调保护比其他保护更有必要。其电力和现有工业设备没有发生大范围损坏。为使电力系统在无电状态下保持最佳状态,对Tbk 12号厂东加尔-帕拉卡萨电站现行关系保护协调进行了重新研究。本期末项目将讨论泰国东加尔普拉卡萨电厂过流继电保护的协调分析。在对过流保护的协调性进行分析的基础上,采用了几种方法,使过流保护更协调,并利用ETAP软件对过流保护进行协调复位。他们还使用手动计算重置协调保护过流继电器。经过比较,可以看出现场安装的继电保护电流较多。有些不太好用。它在存在的工作中发音,这与IEEE的标准ie, 0.2 0.35秒不匹配。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信