{"title":"Rural Electrification and Manufacturing Firm Performance in Benin - An Ex-Ante Impact Assessment","authors":"J. Peters, Colin Vance, M. Harsdorff","doi":"10.2139/SSRN.1635764","DOIUrl":null,"url":null,"abstract":"Productive electricity use is widely believed to contribute to positive impacts of electrification projects. This paper investigates these impacts by comparing the performance of micro manufacturing enterprises in grid-covered and non-covered villages in Northern Benin. Using firm-level data, the empirical analysis employs a Propensity Score Matching. While beneficial impacts are found from firm creation after electrification, firms that existed before actually show a non-significantly inferior performance to their matched counterparts from a non-electrified region. Complementary measures that sensitize firms about the implications of a grid connection are recommended as important features of program design.","PeriodicalId":207453,"journal":{"name":"ERN: Econometric Modeling in Microeconomics (Topic)","volume":"199 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ERN: Econometric Modeling in Microeconomics (Topic)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/SSRN.1635764","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
Productive electricity use is widely believed to contribute to positive impacts of electrification projects. This paper investigates these impacts by comparing the performance of micro manufacturing enterprises in grid-covered and non-covered villages in Northern Benin. Using firm-level data, the empirical analysis employs a Propensity Score Matching. While beneficial impacts are found from firm creation after electrification, firms that existed before actually show a non-significantly inferior performance to their matched counterparts from a non-electrified region. Complementary measures that sensitize firms about the implications of a grid connection are recommended as important features of program design.