{"title":"CdTe grid-connected photovoltaic system at energy commission Malaysia: Performance and sustainability issues","authors":"A. Junid, M. Hamdan, Shazrizal Bakar","doi":"10.1109/STUDENT.2011.6089347","DOIUrl":null,"url":null,"abstract":"Commissioned in November 2009, Malaysia's Energy Commission headquarters utilizes a 71.4kWp rated grid-connected Cadmium-Telluride (CdTe) thin-film photovoltaic system which meets approximately 10% of the building's average electrical power demand. As of June 2011, the photovoltaic panel performance degradation rate is about 3.4% over 1.67 years, i.e. 2% per annum. The system's economic sustainability may be represented by an estimated payback period of 21 years at an Internal Rate of Return (IRR) of 2–4%. Once a higher feed-in tariff supported by the Renewable Energy Act 2010 takes effect, IRR will increase and payback time will fall. Environmental sustainability is supported by the panel manufacturer's written policy that it will collect and recycle panels free of charge.","PeriodicalId":247351,"journal":{"name":"2011 IEEE Conference on Sustainable Utilization and Development in Engineering and Technology (STUDENT)","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 IEEE Conference on Sustainable Utilization and Development in Engineering and Technology (STUDENT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/STUDENT.2011.6089347","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Commissioned in November 2009, Malaysia's Energy Commission headquarters utilizes a 71.4kWp rated grid-connected Cadmium-Telluride (CdTe) thin-film photovoltaic system which meets approximately 10% of the building's average electrical power demand. As of June 2011, the photovoltaic panel performance degradation rate is about 3.4% over 1.67 years, i.e. 2% per annum. The system's economic sustainability may be represented by an estimated payback period of 21 years at an Internal Rate of Return (IRR) of 2–4%. Once a higher feed-in tariff supported by the Renewable Energy Act 2010 takes effect, IRR will increase and payback time will fall. Environmental sustainability is supported by the panel manufacturer's written policy that it will collect and recycle panels free of charge.
马来西亚能源委员会的CdTe并网光伏系统:性能和可持续性问题
马来西亚能源委员会总部于2009年11月投入使用,采用71.4kWp额定并网碲化镉(CdTe)薄膜光伏系统,可满足建筑物平均电力需求的约10%。截至2011年6月,光伏板的性能退化率在1.67年内约为3.4%,即每年2%。该系统的经济可持续性可以用预计21年的投资回收期来表示,内部收益率(IRR)为2-4%。一旦《2010年可再生能源法案》支持的更高的上网电价生效,内部收益率将增加,投资回收期将缩短。电池板制造商的书面政策支持环境可持续性,该政策将免费收集和回收电池板。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信