Visualisation of construction costs and techniques of employment-intensive road construction in developing areas

F. T. Parkins, R. McCutcheon
{"title":"Visualisation of construction costs and techniques of employment-intensive road construction in developing areas","authors":"F. T. Parkins, R. McCutcheon","doi":"10.1109/IV.1999.781563","DOIUrl":null,"url":null,"abstract":"Employment generation in the construction of economically efficient infrastructure can contribute to the alleviation of poverty. Practical Choice of Technique Analysis (COTA-P) is a tool that enables decision makers to estimate the financial and socio-economic costs involved in a construction. COTA-P looks at the construction from an employment-intensive perspective, with the underlying idea to substitute as much labour for machines as is feasible, and to promote the use of local labour in underdeveloped and poor areas. COTA-P consists of a technical screening phase, a financial and socio-economical screening phase, and thirdly the monitoring and evaluation phase. Each phase analyses the possibility of the enhanced use of labour. COTA-P is programmed in a Windows 32-bit environment, and gives the user maximum user friendliness, while allowing for extensive manipulation of the core variables and parameters, thus enabling the user to analyse various scenarios in a short time.","PeriodicalId":340240,"journal":{"name":"1999 IEEE International Conference on Information Visualization (Cat. No. PR00210)","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-07-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"1999 IEEE International Conference on Information Visualization (Cat. No. PR00210)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IV.1999.781563","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Employment generation in the construction of economically efficient infrastructure can contribute to the alleviation of poverty. Practical Choice of Technique Analysis (COTA-P) is a tool that enables decision makers to estimate the financial and socio-economic costs involved in a construction. COTA-P looks at the construction from an employment-intensive perspective, with the underlying idea to substitute as much labour for machines as is feasible, and to promote the use of local labour in underdeveloped and poor areas. COTA-P consists of a technical screening phase, a financial and socio-economical screening phase, and thirdly the monitoring and evaluation phase. Each phase analyses the possibility of the enhanced use of labour. COTA-P is programmed in a Windows 32-bit environment, and gives the user maximum user friendliness, while allowing for extensive manipulation of the core variables and parameters, thus enabling the user to analyse various scenarios in a short time.
发展中地区就业密集型道路建设的工程成本和技术可视化
在建设具有经济效益的基础设施方面创造就业机会有助于减轻贫穷。技术分析的实际选择(COTA-P)是一种工具,使决策者能够估计涉及建设的财务和社会经济成本。COTA-P从就业密集型的角度来看待建设,其基本思想是尽可能多地用劳动力代替机器,并促进在不发达和贫困地区使用当地劳动力。COTA-P包括技术筛选阶段,财政和社会经济筛选阶段,第三是监测和评价阶段。每个阶段都分析了加强使用劳动力的可能性。COTA-P在Windows 32位环境中编程,并为用户提供最大的用户友好性,同时允许对核心变量和参数进行广泛的操作,从而使用户能够在短时间内分析各种场景。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信