{"title":"Visualisation of construction costs and techniques of employment-intensive road construction in developing areas","authors":"F. T. Parkins, R. McCutcheon","doi":"10.1109/IV.1999.781563","DOIUrl":null,"url":null,"abstract":"Employment generation in the construction of economically efficient infrastructure can contribute to the alleviation of poverty. Practical Choice of Technique Analysis (COTA-P) is a tool that enables decision makers to estimate the financial and socio-economic costs involved in a construction. COTA-P looks at the construction from an employment-intensive perspective, with the underlying idea to substitute as much labour for machines as is feasible, and to promote the use of local labour in underdeveloped and poor areas. COTA-P consists of a technical screening phase, a financial and socio-economical screening phase, and thirdly the monitoring and evaluation phase. Each phase analyses the possibility of the enhanced use of labour. COTA-P is programmed in a Windows 32-bit environment, and gives the user maximum user friendliness, while allowing for extensive manipulation of the core variables and parameters, thus enabling the user to analyse various scenarios in a short time.","PeriodicalId":340240,"journal":{"name":"1999 IEEE International Conference on Information Visualization (Cat. No. PR00210)","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-07-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"1999 IEEE International Conference on Information Visualization (Cat. No. PR00210)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IV.1999.781563","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
Employment generation in the construction of economically efficient infrastructure can contribute to the alleviation of poverty. Practical Choice of Technique Analysis (COTA-P) is a tool that enables decision makers to estimate the financial and socio-economic costs involved in a construction. COTA-P looks at the construction from an employment-intensive perspective, with the underlying idea to substitute as much labour for machines as is feasible, and to promote the use of local labour in underdeveloped and poor areas. COTA-P consists of a technical screening phase, a financial and socio-economical screening phase, and thirdly the monitoring and evaluation phase. Each phase analyses the possibility of the enhanced use of labour. COTA-P is programmed in a Windows 32-bit environment, and gives the user maximum user friendliness, while allowing for extensive manipulation of the core variables and parameters, thus enabling the user to analyse various scenarios in a short time.