R. Tavakkoli-Moghaddam, A. Rahimi-Vahed, A. Mirzaei
{"title":"Solving a Bi-Criteria Permutation Flow Shop Problem Using Immune Algorithm","authors":"R. Tavakkoli-Moghaddam, A. Rahimi-Vahed, A. Mirzaei","doi":"10.1109/SCIS.2007.367669","DOIUrl":null,"url":null,"abstract":"A flow shop problem as a typical manufacturing challenge has gained wide attention in academic fields. In this paper, we consider a bi-criteria permutation flow shop scheduling problem, in which the weighted mean completion time and the weighted mean tardiness are to be minimized simultaneously. Since a flow shop scheduling problem has been proved to be NP-hard in strong sense, an effective multi-objective immune algorithm (MOIA) is proposed for searching locally Pareto-optimal frontier for the given problem. To prove the efficiency of the proposed algorithm, a number of test problems are solved and the efficiency of the proposed algorithm, based on some comparison metrics, is compared with a distinguished multi-objective genetic algorithm, i.e. SPEA-II. The computational results show that the proposed MOIA performs better than the above genetic algorithm, especially for large-sized problems","PeriodicalId":184726,"journal":{"name":"2007 IEEE Symposium on Computational Intelligence in Scheduling","volume":"55 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"16","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 IEEE Symposium on Computational Intelligence in Scheduling","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SCIS.2007.367669","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 16
Abstract
A flow shop problem as a typical manufacturing challenge has gained wide attention in academic fields. In this paper, we consider a bi-criteria permutation flow shop scheduling problem, in which the weighted mean completion time and the weighted mean tardiness are to be minimized simultaneously. Since a flow shop scheduling problem has been proved to be NP-hard in strong sense, an effective multi-objective immune algorithm (MOIA) is proposed for searching locally Pareto-optimal frontier for the given problem. To prove the efficiency of the proposed algorithm, a number of test problems are solved and the efficiency of the proposed algorithm, based on some comparison metrics, is compared with a distinguished multi-objective genetic algorithm, i.e. SPEA-II. The computational results show that the proposed MOIA performs better than the above genetic algorithm, especially for large-sized problems