{"title":"Distributed scheduling for real-time railway traffic control","authors":"T. Letia, M. Hulea, R. Miron","doi":"10.1109/IMCSIT.2008.4747316","DOIUrl":null,"url":null,"abstract":"The increase of railway traffic efficiency and flexibility requires new real-time scheduling and control methods. New charter trains have to be added continuously without disturbing the other (periodic) train moves or decreasing the safety conditions. A distributed method to schedule new trains such that their real-time constraints are fulfilled is presented. The trains have timelines to meet and hence the deadlines are extracted taking into account the included laxity. The trains have pre-established routes specifying the stations and required arrival times. The paths containing the block sections from one station to another are dynamically allocated without leading to deadlocks.","PeriodicalId":267715,"journal":{"name":"2008 International Multiconference on Computer Science and Information Technology","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 International Multiconference on Computer Science and Information Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IMCSIT.2008.4747316","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7
Abstract
The increase of railway traffic efficiency and flexibility requires new real-time scheduling and control methods. New charter trains have to be added continuously without disturbing the other (periodic) train moves or decreasing the safety conditions. A distributed method to schedule new trains such that their real-time constraints are fulfilled is presented. The trains have timelines to meet and hence the deadlines are extracted taking into account the included laxity. The trains have pre-established routes specifying the stations and required arrival times. The paths containing the block sections from one station to another are dynamically allocated without leading to deadlocks.