Saikat Dutra, O. Olaby, T. Harrison, P. Kaijuka, Maria Sarniento-Carnevali, S. Bemment, C. Ward, R. Dixon
{"title":"Development of Controller for REPOINT Light Railway Track Switch","authors":"Saikat Dutra, O. Olaby, T. Harrison, P. Kaijuka, Maria Sarniento-Carnevali, S. Bemment, C. Ward, R. Dixon","doi":"10.1109/CONTROL.2018.8516725","DOIUrl":null,"url":null,"abstract":"REPOINT Light track switch is a newly devised track switch which is under development. The switch is designed to enhance the reliability of the railway network by implementing closed loop control concept and by introducing actuator redundancy in the switch design. In the present stage of the research, the performance of the designed controller is presented with the experimental data in the laboratory environment. After successful experiments and tests, the full-scale demonstrator of the switch will be deployed to the railway network.","PeriodicalId":266112,"journal":{"name":"2018 UKACC 12th International Conference on Control (CONTROL)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 UKACC 12th International Conference on Control (CONTROL)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CONTROL.2018.8516725","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
REPOINT Light track switch is a newly devised track switch which is under development. The switch is designed to enhance the reliability of the railway network by implementing closed loop control concept and by introducing actuator redundancy in the switch design. In the present stage of the research, the performance of the designed controller is presented with the experimental data in the laboratory environment. After successful experiments and tests, the full-scale demonstrator of the switch will be deployed to the railway network.