Research on anti-separation and anti-overturning of concrete block structures of a spillway with a protruding head during construction

Mai Sy Hung
{"title":"Research on anti-separation and anti-overturning of concrete block structures of a spillway with a protruding head during construction","authors":"Mai Sy Hung","doi":"10.31814/stce.huce2023-17(2)-16","DOIUrl":null,"url":null,"abstract":"In concrete gravity dams, reinforced concrete, and its components, depending on the working conditions of the concrete in separate parts of the dam during the operation period, should be divided into concrete zones with different intensities. However, many projects choose to construct the spillway’s overhang to save concrete, still assuring working conditions while creating the most cost-effective cross-section of the spillway. Although this will result in a proper partition of the concrete, anchoring the connection between the blocks must be secured;otherwise, the block may separate and even become eccentric and spill over. This may result in objects falling,works being destroyed, and a significant safety danger. This study approaches to ensure the safety of spillwayswith overhanging blocks by calculating and analyzing the risk of block separation and overturning, therebygiving a suitable solution for pouring volume and creating the best anchor connection to keep the whole damsafe and stable during construction and operation.","PeriodicalId":387908,"journal":{"name":"Journal of Science and Technology in Civil Engineering (STCE) - HUCE","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Science and Technology in Civil Engineering (STCE) - HUCE","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31814/stce.huce2023-17(2)-16","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In concrete gravity dams, reinforced concrete, and its components, depending on the working conditions of the concrete in separate parts of the dam during the operation period, should be divided into concrete zones with different intensities. However, many projects choose to construct the spillway’s overhang to save concrete, still assuring working conditions while creating the most cost-effective cross-section of the spillway. Although this will result in a proper partition of the concrete, anchoring the connection between the blocks must be secured;otherwise, the block may separate and even become eccentric and spill over. This may result in objects falling,works being destroyed, and a significant safety danger. This study approaches to ensure the safety of spillwayswith overhanging blocks by calculating and analyzing the risk of block separation and overturning, therebygiving a suitable solution for pouring volume and creating the best anchor connection to keep the whole damsafe and stable during construction and operation.
拱头溢洪道混凝土砌块结构在施工过程中的抗分离抗倾覆研究
在混凝土重力坝中,钢筋混凝土及其组成部分,应根据大坝运行期间各部分混凝土的工况,划分成不同强度的混凝土区。然而,许多工程选择建造溢洪道的悬挑以节省混凝土,在保证工作条件的同时创造最具成本效益的溢洪道断面。虽然这将导致混凝土的适当分隔,但必须固定砌块之间的连接,否则砌块可能会分离甚至偏心溢出。这可能导致物体坠落,工程被破坏,并造成重大的安全危险。本研究通过对悬垂块体溢洪道块体分离和倾覆风险的计算和分析,对悬垂块体溢洪道的安全进行了探讨,从而给出了合适的浇筑量解决方案,并建立了最佳锚固连接,保证了整个坝体在施工和运行过程中的安全稳定。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信