Research Progress on Post Cast Strip Construction Technology of Super Long Concrete Structure

Changming Hu, Ting Wang, Shouzhong Lin, X. Zhao
{"title":"Research Progress on Post Cast Strip Construction Technology of Super Long Concrete Structure","authors":"Changming Hu, Ting Wang, Shouzhong Lin, X. Zhao","doi":"10.1109/ISTTCA53489.2021.9654569","DOIUrl":null,"url":null,"abstract":"The construction technology of post cast strip seriously affects the construction quality and structural safety. The current specifications do not give uniform and clear provisions on the width of post cast strip. This paper briefly expounds the current situation, advantages and disadvantages of post cast strip construction, and compares and analyzes the construction processes, applicable conditions, advantages and disadvantages of fast and easy closing net, inflatable core formwork and bubble membrane formwork; Wang tiemeng model is used to calculate the effect of post cast strip width on concrete shrinkage on both sides. The results show that the post cast strip width has little effect on shrinkage. The post cast strip construction technology of PVC pipe is proposed, which can improve the construction quality and realize green construction. Therefore, combined with the innovative post cast strip construction technology and specific working conditions, its width can be set optimally.","PeriodicalId":383266,"journal":{"name":"2021 4th International Symposium on Traffic Transportation and Civil Architecture (ISTTCA)","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 4th International Symposium on Traffic Transportation and Civil Architecture (ISTTCA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISTTCA53489.2021.9654569","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The construction technology of post cast strip seriously affects the construction quality and structural safety. The current specifications do not give uniform and clear provisions on the width of post cast strip. This paper briefly expounds the current situation, advantages and disadvantages of post cast strip construction, and compares and analyzes the construction processes, applicable conditions, advantages and disadvantages of fast and easy closing net, inflatable core formwork and bubble membrane formwork; Wang tiemeng model is used to calculate the effect of post cast strip width on concrete shrinkage on both sides. The results show that the post cast strip width has little effect on shrinkage. The post cast strip construction technology of PVC pipe is proposed, which can improve the construction quality and realize green construction. Therefore, combined with the innovative post cast strip construction technology and specific working conditions, its width can be set optimally.
超长混凝土结构后浇条施工技术研究进展
后浇带的施工工艺严重影响到施工质量和结构安全。现行规范对后铸钢条的宽度没有统一明确的规定。简要阐述了后浇条施工的现状、优缺点,并对快速易闭网、充气芯模板、气泡膜模板的施工工艺、适用条件、优缺点进行了比较分析;采用王铁萌模型计算后浇条宽度对两侧混凝土收缩的影响。结果表明,后浇铸带宽度对收缩率影响不大。提出了PVC管材后浇铸条施工工艺,提高了施工质量,实现了绿色施工。因此,结合创新的后浇带施工技术和具体的工作条件,可以对其宽度进行最优设置。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信