Analisis Perbandingan Efisiensi Penyaluran Listrik Antara Penghantar ACSR dan ACCC pada Sistem Transmisi 150kV

Oktaria Handayani, Tasdik Darmana, Christine Widyastuti
{"title":"Analisis Perbandingan Efisiensi Penyaluran Listrik Antara Penghantar ACSR dan ACCC pada Sistem Transmisi 150kV","authors":"Oktaria Handayani, Tasdik Darmana, Christine Widyastuti","doi":"10.33322/ENERGI.V11I1.480","DOIUrl":null,"url":null,"abstract":"Electricity need in Indonesia continues to increase in accordance with the rate of recovery of the economy and industry and the increase in population. The transmission line transmits electricity from the power plant to the load center via the High Voltage transmission lines (SUTT) or Extra High Voltage Transmissio lines (SUTET), because the long distance causes power losses. The condition before the reconducting of Tebing Tinggi - Kuala Tanjung transmission uses ACSR conductor types and after the reconducting has been replaced by the ACCC, where ACCC has 2 times the current trying of the type of ACSR. In this study, we will examine and analyze the magnitude of the power losses and the efficiency of the distribution of the two types of ACSR and ACCC supply channels with a case study of the 150 kV transmission system Tebing Tinggi - Kuala Tanjung which has a distance of 71.5 km. From the calculation results obtained, after the reconducting process using the conductor the ACCC was able to reduce power losses and increase efficiency by 1.35%. \n  \n ","PeriodicalId":377082,"journal":{"name":"Energi & Kelistrikan","volume":"195 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Energi & Kelistrikan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33322/ENERGI.V11I1.480","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Electricity need in Indonesia continues to increase in accordance with the rate of recovery of the economy and industry and the increase in population. The transmission line transmits electricity from the power plant to the load center via the High Voltage transmission lines (SUTT) or Extra High Voltage Transmissio lines (SUTET), because the long distance causes power losses. The condition before the reconducting of Tebing Tinggi - Kuala Tanjung transmission uses ACSR conductor types and after the reconducting has been replaced by the ACCC, where ACCC has 2 times the current trying of the type of ACSR. In this study, we will examine and analyze the magnitude of the power losses and the efficiency of the distribution of the two types of ACSR and ACCC supply channels with a case study of the 150 kV transmission system Tebing Tinggi - Kuala Tanjung which has a distance of 71.5 km. From the calculation results obtained, after the reconducting process using the conductor the ACCC was able to reduce power losses and increase efficiency by 1.35%.    
随着经济和工业的恢复速度以及人口的增加,印度尼西亚的电力需求继续增加。输电线路通过高压输电线路(SUTT)或特高压输电线路(SUTET)将电厂的电力输送到负荷中心,因为距离较远会造成电力损耗。特炳汀吉-瓜丹中输电在重导前使用ACSR导线类型,重导后使用ACCC导线类型,ACCC导线类型的电流是ACSR导线类型的2倍。在这项研究中,我们将检查和分析两种类型的ACSR和ACCC供电通道的功率损耗大小和分配效率,并以150千伏输电系统为例进行研究,该系统的距离为71.5公里。从计算结果来看,使用该导体进行重导后,ACCC能够降低功率损耗,提高效率1.35%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信