{"title":"Applying Probabilistic Method in Determining the Number of Spare Transformers and Their Timing Requirements","authors":"W. Wangdee, Wenyuan Li, W. Shum, P. Choudhury","doi":"10.1109/CCECE.2007.41","DOIUrl":null,"url":null,"abstract":"This paper presents a probabilistic approach to determining the number of spare transformers for a group of transformers and the timing requirement for each spare transformer to meet the specific reliability criterion. The historical reliability performance designated as system average interruption duration index (SAIDI) is used to establish the specified reliability criterion. The proposed method considers both repairable and aging failures of transformers. The aging failure model of transformers is incorporated in the analysis in order to practically account for the fact that the electric power system in North America is aging, and a considerable number of equipment are approaching their end of life. The 138/25 kV 25 MVA transformer group in the BCTC system, consisting of both fixed turn ratio and on-load tap changing transformers, is used for an illustration in the paper. The detailed analysis in determining the number of spare transformers and their timing requirements during a 10 year planning period is presented.","PeriodicalId":183910,"journal":{"name":"2007 Canadian Conference on Electrical and Computer Engineering","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-04-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 Canadian Conference on Electrical and Computer Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CCECE.2007.41","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

Abstract

This paper presents a probabilistic approach to determining the number of spare transformers for a group of transformers and the timing requirement for each spare transformer to meet the specific reliability criterion. The historical reliability performance designated as system average interruption duration index (SAIDI) is used to establish the specified reliability criterion. The proposed method considers both repairable and aging failures of transformers. The aging failure model of transformers is incorporated in the analysis in order to practically account for the fact that the electric power system in North America is aging, and a considerable number of equipment are approaching their end of life. The 138/25 kV 25 MVA transformer group in the BCTC system, consisting of both fixed turn ratio and on-load tap changing transformers, is used for an illustration in the paper. The detailed analysis in determining the number of spare transformers and their timing requirements during a 10 year planning period is presented.
应用概率方法确定备用变压器数量及其时序要求
本文提出了一种确定一组变压器的备用变压器数量和每台备用变压器满足特定可靠性标准的时间要求的概率方法。采用系统平均中断时间指数(SAIDI)作为历史可靠性指标,建立指定的可靠性准则。该方法同时考虑了变压器的可修故障和老化故障。在分析中引入变压器的老化失效模型,是为了切实考虑北美地区电力系统的老化,以及相当数量的设备接近其使用寿命的事实。本文以BCTC系统中由固定匝比变压器和有载分接变换变压器组成的138/ 25kv 25mva变压器组为例进行说明。详细分析了10年规划期内备用变压器数量的确定及其时序要求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信