Analysis of Investment Feasibility of 25mw Power Plant Development Project in Paper Factory in Karawang in Financial Aspects, Technology and Environmental

Rosalendro Eddy Nugroho, Ihsan Maulana
{"title":"Analysis of Investment Feasibility of 25mw Power Plant Development Project in Paper Factory in Karawang in Financial Aspects, Technology and Environmental","authors":"Rosalendro Eddy Nugroho, Ihsan Maulana","doi":"10.36348/sjbms.2020.v05i07.008","DOIUrl":null,"url":null,"abstract":"Electrical energy is a source of energy needed by industry. This study aims to analyze the feasibility of investing in the construction of a pulp and paper industry power plant in Karawang. Research in terms of aspects of technology, environmental impacts are compared in the application of old technology and new technology. Financial aspects with the capital budgeting method. From the results of studies in the aspects of Technology 29.66 Tons / h Coal can produce 25 MW of electricity and supply steam for paper production. While the old Boiler 28.6 Ton / h only supplies steam for paper production, so that the Power Plant Project is more efficient than production costs and multifunctional technology. From an environmental aspect the technology used for fly ash is using ESP. ESP can not only reduce Sox, Nox, Total Particulate can also eliminate HG and fine dust so that it is safe for the environment and financial aspects of calculations with a payback period showing 3.62 years or 3 years 7 1/2 months, by using a Discounted payback return period is 4.21 Year or 4 years 2.5 months, using a Net Present Value (NPV) of $ 32,513,596.83, using the Internal Rate of Return (IRR) method is 36.88%, and using the Profitability Index (PI) method is 2.29. After comparing with the eligibility criteria, it can be concluded that this project is feasible to be implemented.","PeriodicalId":277639,"journal":{"name":"Saudi Journal of Business and Management Studies","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Saudi Journal of Business and Management Studies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36348/sjbms.2020.v05i07.008","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Electrical energy is a source of energy needed by industry. This study aims to analyze the feasibility of investing in the construction of a pulp and paper industry power plant in Karawang. Research in terms of aspects of technology, environmental impacts are compared in the application of old technology and new technology. Financial aspects with the capital budgeting method. From the results of studies in the aspects of Technology 29.66 Tons / h Coal can produce 25 MW of electricity and supply steam for paper production. While the old Boiler 28.6 Ton / h only supplies steam for paper production, so that the Power Plant Project is more efficient than production costs and multifunctional technology. From an environmental aspect the technology used for fly ash is using ESP. ESP can not only reduce Sox, Nox, Total Particulate can also eliminate HG and fine dust so that it is safe for the environment and financial aspects of calculations with a payback period showing 3.62 years or 3 years 7 1/2 months, by using a Discounted payback return period is 4.21 Year or 4 years 2.5 months, using a Net Present Value (NPV) of $ 32,513,596.83, using the Internal Rate of Return (IRR) method is 36.88%, and using the Profitability Index (PI) method is 2.29. After comparing with the eligibility criteria, it can be concluded that this project is feasible to be implemented.
卡拉旺造纸厂25mw电厂开发项目投资可行性的财务、技术和环境分析
电能是工业所需的一种能源。本研究旨在分析投资兴建卡拉旺制浆造纸工业发电厂的可行性。从技术方面进行研究,比较了新老技术应用对环境的影响。财务方面的资本预算方法。从技术方面的研究结果来看,29.66吨/小时的煤可以产生25兆瓦的电力,并为造纸提供蒸汽。而旧锅炉28.6吨/小时仅为造纸提供蒸汽,使电厂项目效率高于生产成本和多功能技术。从环境方面的技术用于粉煤灰使用ESP。ESP不仅可以减少袜,氮氧化物,总颗粒还可以消除汞和粉尘,是安全的计算环境和金融方面的投资回收期显示3.62年或3年7 1/2个月,通过使用一个贴现回报回报周期是4.21年或4年2.5个月,使用净现值(NPV) 32513596 .83点美元,使用内部收益率(IRR)方法是36.88%,盈利能力指数(PI)法为2.29。通过与资质标准的比较,认为本项目具有实施的可行性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信