{"title":"LP based Model to Find Optimal Portfolio to Maximize the Profit Index in Software Project Billing","authors":"Anupam Das, Mukul Sharma, Chayan Halder, Anirban Das, Sagar Kumar Dhawa, Krishnadas Banerjee","doi":"10.1109/ICGCIOT.2018.8753102","DOIUrl":null,"url":null,"abstract":"Throughout the globe, billions of dollars are spent in IT sectors for building software projects. Building software is continuous process with numerous hazards and so many issues and changes. Those rigorous interruptions may cause soaring of cost from both client’s and IT companies. In this paper we have the objective to evaluate the cost of wages of technical resources of any IT farm and the revenue coming after those resources are billed into a client’s project. Subsequently we have designed an LP based model to maximize the profit index.","PeriodicalId":269682,"journal":{"name":"2018 Second International Conference on Green Computing and Internet of Things (ICGCIoT)","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 Second International Conference on Green Computing and Internet of Things (ICGCIoT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICGCIOT.2018.8753102","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Throughout the globe, billions of dollars are spent in IT sectors for building software projects. Building software is continuous process with numerous hazards and so many issues and changes. Those rigorous interruptions may cause soaring of cost from both client’s and IT companies. In this paper we have the objective to evaluate the cost of wages of technical resources of any IT farm and the revenue coming after those resources are billed into a client’s project. Subsequently we have designed an LP based model to maximize the profit index.