Perancangan Efisiensi Lintasan Produksi dengan Menggunakan Metode Helgeson-Birnie (Ranked Positional Weight) Untuk Meningkatkan Kapasitas Produksi (Studi Kasus Pada Unit Produksi I Shift I PT. SUMBETRI MEGAH)

Wiky Sabardi, Ryan Pramanda, Dewiyana, Diki Suhanda
{"title":"Perancangan Efisiensi Lintasan Produksi dengan Menggunakan Metode Helgeson-Birnie (Ranked Positional Weight) Untuk Meningkatkan Kapasitas Produksi (Studi Kasus Pada Unit Produksi I Shift I PT. SUMBETRI MEGAH)","authors":"Wiky Sabardi, Ryan Pramanda, Dewiyana, Diki Suhanda","doi":"10.55377/jurutera.v8i02.5534","DOIUrl":null,"url":null,"abstract":"The problem of line balancing in industry, assembling, and manufacturing often occurs. This is indicated by a relatively high bottleneck of work in process at several stations, resulting in non-optimal line efficiency and non-smooth process flow. This study aims to calculate line balancing and determine the division of work stations that can increase production capacity in the production unit I shift I pt. Magnificent resource. This study used the Helgeson-Birnie (Ranked Positional Weight) method. From this research, the design results were obtained with line efficiency (line efficiency) 89.16%, idle time 2730.85, balance delay 10.84%, smoothness index (smoothness index) 781.24, and the number of work stations 15. Based on the calculation, it can be seen that there is an increase in line efficiency from 74.46% to 89.35%, which is 14.89%.","PeriodicalId":414829,"journal":{"name":"JURUTERA - Jurnal Umum Teknik Terapan","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"JURUTERA - Jurnal Umum Teknik Terapan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55377/jurutera.v8i02.5534","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The problem of line balancing in industry, assembling, and manufacturing often occurs. This is indicated by a relatively high bottleneck of work in process at several stations, resulting in non-optimal line efficiency and non-smooth process flow. This study aims to calculate line balancing and determine the division of work stations that can increase production capacity in the production unit I shift I pt. Magnificent resource. This study used the Helgeson-Birnie (Ranked Positional Weight) method. From this research, the design results were obtained with line efficiency (line efficiency) 89.16%, idle time 2730.85, balance delay 10.84%, smoothness index (smoothness index) 781.24, and the number of work stations 15. Based on the calculation, it can be seen that there is an increase in line efficiency from 74.46% to 89.35%, which is 14.89%.
通过使用赫尔格森- birnie方法(具有正体重)生产效率的设计方法来提高生产能力(I Shift生产单位的个案研究)
生产线平衡问题在工业、装配和制造中经常发生。这表现在几个工位的在制品瓶颈比较高,导致生产线效率不优,工艺流程不顺畅。本研究旨在计算生产线平衡,并确定能提高生产单位生产能力的工位划分。本研究采用Helgeson-Birnie (ranking Positional Weight)方法。通过本次研究,获得线路效率(line efficiency) 89.16%,空闲时间2730.85,平衡时延10.84%,平滑度指数(smoothness index) 781.24,工位数15个的设计结果。通过计算可以看出,线路效率从74.46%提高到89.35%,提高了14.89%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信