Cost Evolution Throughout the Construction Value Chain

Zakaria Dakhli, Z. Lafhaj
{"title":"Cost Evolution Throughout the Construction Value Chain","authors":"Zakaria Dakhli, Z. Lafhaj","doi":"10.29173/MOCS74","DOIUrl":null,"url":null,"abstract":"This study is based on the following observation: there is a significant difference between the initial budget forecast and the final budget of construction project. Cost differences in construction projects between the first estimate made by the engagement committee and the actual construction cost at the end of the project are highlighted. Our study therefore focuses on indicators that track the overall cost of a construction project from the client's perspective, in this case the real estate development company. The objectives are as follow: Highlight cost variances in construction projects and analyze the gaps between the initial cost design by customer and final construction. The waste between the \"design\", “marketing” and \"construction\" phases is discussed. The paper also quantifies waste in terms of cost between the phases. The analysis reveal that the overall cost evolution is 2.59%, with 0.89% coming from the Construction phase and 1.72% from the Marketing phase, and 0.09% from the Design phase. The results could be of interest to a wide range of researchers working on the interface between the design and construction phases.","PeriodicalId":422911,"journal":{"name":"Modular and Offsite Construction (MOC) Summit Proceedings","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Modular and Offsite Construction (MOC) Summit Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29173/MOCS74","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This study is based on the following observation: there is a significant difference between the initial budget forecast and the final budget of construction project. Cost differences in construction projects between the first estimate made by the engagement committee and the actual construction cost at the end of the project are highlighted. Our study therefore focuses on indicators that track the overall cost of a construction project from the client's perspective, in this case the real estate development company. The objectives are as follow: Highlight cost variances in construction projects and analyze the gaps between the initial cost design by customer and final construction. The waste between the "design", “marketing” and "construction" phases is discussed. The paper also quantifies waste in terms of cost between the phases. The analysis reveal that the overall cost evolution is 2.59%, with 0.89% coming from the Construction phase and 1.72% from the Marketing phase, and 0.09% from the Design phase. The results could be of interest to a wide range of researchers working on the interface between the design and construction phases.
整个建筑价值链的成本演变
本研究基于以下观察:建设项目的初始预算预测与最终预算之间存在显著差异。在工程项目中,审计委员会的首次估算与项目结束时的实际工程成本之间的成本差异是突出的。因此,我们的研究侧重于从客户的角度跟踪建筑项目总成本的指标,在本例中是房地产开发公司。目标如下:突出建筑项目中的成本差异,分析客户初始成本设计与最终施工之间的差距。讨论了“设计”、“营销”和“施工”阶段之间的浪费。本文还根据各个阶段之间的成本对浪费进行了量化。分析表明,总成本演变为2.59%,其中0.89%来自建设阶段,1.72%来自营销阶段,0.09%来自设计阶段。这些结果可能会引起许多研究设计和施工阶段之间界面的研究人员的兴趣。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信