Fuzzy dynamic programming for robust direct load control

K. Huang, H.T. Yang, C. Liao, C. Huang
{"title":"Fuzzy dynamic programming for robust direct load control","authors":"K. Huang, H.T. Yang, C. Liao, C. Huang","doi":"10.1109/EMPD.1998.702747","DOIUrl":null,"url":null,"abstract":"This paper develops a fuzzy dynamic programming (FDP) approach to solving the direct load control (DLC) problem of power system air conditioner loads (ACLs). The interrupted capacities of the ACLs and the system load demands are all regarded as fuzzy variables. The scheduling of the DLC and the unit commitment (UC) is integrated into the FDP structure to reduce the system peak load as well as the total operating costs, The solution approach has been practically tested on the Taiwan power 38-unit system with 15 ACLs groups. In the tests, the Monte-Carlo simulation technique is employed to assess the robustness of the solution obtained from the proposed FDP approach for various load uncertainties. The results are given and compared to those without consideration of the load uncertainties.","PeriodicalId":434526,"journal":{"name":"Proceedings of EMPD '98. 1998 International Conference on Energy Management and Power Delivery (Cat. No.98EX137)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1998-03-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of EMPD '98. 1998 International Conference on Energy Management and Power Delivery (Cat. No.98EX137)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EMPD.1998.702747","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

Abstract

This paper develops a fuzzy dynamic programming (FDP) approach to solving the direct load control (DLC) problem of power system air conditioner loads (ACLs). The interrupted capacities of the ACLs and the system load demands are all regarded as fuzzy variables. The scheduling of the DLC and the unit commitment (UC) is integrated into the FDP structure to reduce the system peak load as well as the total operating costs, The solution approach has been practically tested on the Taiwan power 38-unit system with 15 ACLs groups. In the tests, the Monte-Carlo simulation technique is employed to assess the robustness of the solution obtained from the proposed FDP approach for various load uncertainties. The results are given and compared to those without consideration of the load uncertainties.
鲁棒直接负荷控制的模糊动态规划
针对电力系统空调负荷直接控制问题,提出了一种模糊动态规划方法。acl的中断容量和系统负载需求均作为模糊变量。将DLC和UC的调度整合到FDP结构中,以降低系统的峰值负荷和总运行成本,该解决方案已在台湾电力38个机组15个acl组的系统中进行了实际测试。在测试中,采用蒙特卡罗模拟技术来评估从所提出的FDP方法获得的解在各种负载不确定性下的鲁棒性。给出了计算结果,并与不考虑荷载不确定性的计算结果进行了比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信