Meter placement for real-time monitoring of distribution feeders

Mesut E. Baran, Jinxiang Zhu, Arthur W. Kelley
{"title":"Meter placement for real-time monitoring of distribution feeders","authors":"Mesut E. Baran, Jinxiang Zhu, Arthur W. Kelley","doi":"10.1109/PICA.1995.515188","DOIUrl":null,"url":null,"abstract":"This paper identifies the data requirements for monitoring and control of distribution. It points out that in addition to having supervisory control and data acquisition on switches and control equipment, methods are needed to obtain an accurate estimation of data needed for feeder automation functions. A meter placement method is proposed for this purpose. It is shown that the measurements from such a metering scheme can be used with a state estimator to provide the real-time data needed for real-time monitoring of a distribution system.","PeriodicalId":294493,"journal":{"name":"Proceedings of Power Industry Computer Applications Conference","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"109","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of Power Industry Computer Applications Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PICA.1995.515188","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 109

Abstract

This paper identifies the data requirements for monitoring and control of distribution. It points out that in addition to having supervisory control and data acquisition on switches and control equipment, methods are needed to obtain an accurate estimation of data needed for feeder automation functions. A meter placement method is proposed for this purpose. It is shown that the measurements from such a metering scheme can be used with a state estimator to provide the real-time data needed for real-time monitoring of a distribution system.
用于实时监控配电馈线的仪表位置
本文明确了配电监控的数据需求。指出除了对开关和控制设备进行监控和数据采集外,还需要对馈线自动化功能所需数据进行准确估计的方法。为此提出了一种仪表放置方法。结果表明,这种计量方案的测量结果可以与状态估计器结合使用,为配电系统的实时监控提供所需的实时数据。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信