{"title":"Analisis Potensi Likuefaksi dan Perbaikan Tanah dengan Stone Column: Studi Kasus pada Coal Shelter PLTU Lontar, Banten","authors":"Yuli Fajarwati, Rama Indera Kusuma","doi":"10.21831/INERSIA.V17I1.40570","DOIUrl":null,"url":null,"abstract":"ABSTRACT The high demand for electricity needs requires the availability of new generation sites. The new plant developed is a PLTU in Lontar. The condition of coal shelter as a research site dominated by silty clay and silty sand and located in the earthquake zoning is high that the planning of the coal shelter area must accordance with the feasibility of building establishment, it is necessary to analyze the potential liquefaction and improvement methods. Soil improvement efforts to reduce the potential for liquefaction include soil improvement with stone columns. The method of liquefaction analysis in this study uses the method developed by Idriss and Boulanger. The results of the analysis of the potential for liquefaction at BH-1 occurred at a depth of 3-16 m and at BH-3 the potential for liquefaction occurred at a depth of 4-24 m. Potential of the thickest layer for liquefaction is at BH-3 with a depth of 24 m. Improvement with a stone column can reduce the potential for liquefaction and can increase the value of the safety factor against the potential for liquefaction at the coal shelter location. Improvement analysis with a stone column using Plaxis software, the value of the safe factor after installing the stone column at BH-1 FS 2.89, at BH-3 FS became 2.65. ABSTRAKBanyaknya permintaan kebutuhan listrik yang tinggi diperlukan ketersediaan lokasi pembangkit baru. Pembangkit baru yang dikembangkan yaitu PLTU Batubara di Lontar. Kondisi coal shelter sebagai lokasi penelitian yang didominasi oleh lapisan tanah lempung kelanauan dan pasir kelanauan serta berada pada zonasi gempa cukup tinggi sehingga perencanaan area coal shelter harus memenuhi syarat kelayakan pendirian bangunan, maka perlu dilakukan analisis potensi likuefaksi serta metode perbaikannya. Upaya perbaikan tanah untuk mengurangi potensi likuefaksi yaitu perbaikan tanah dengan stone column (kolom batu). Metode analisis likuefaksi pada penelitian ini menggunakan metode yang dikembangkan oleh Idriss dan Boulanger. Hasil analisis potensi likuefaksi pada titik BH-1 terjadi di kedalaman 3-16 m dan pada titik BH-3 potensi likuefaksi terjadi pada kedalaman 4-24 m. Lapisan yang paling tebal mengalami potensi likuefaksi ada pada titik BH-3 dengan kedalaman 24 m. Perbaikan dengan stone column dapat mengurangi potensi likuefaksi dan mampu meningkatkan nilai faktor keamanan terhadap potensi likuefaksi di lokasi coal shelter. Analisis perbaikian dengan stone column menggunakan software Plaxis, nilai faktor aman setelah dipasang stone column pada titik BH-1 FS 2,89, pada titik BH-3 FS menjadi 2,65.","PeriodicalId":440737,"journal":{"name":"INERSIA: lNformasi dan Ekspose hasil Riset teknik SIpil dan Arsitektur","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"INERSIA: lNformasi dan Ekspose hasil Riset teknik SIpil dan Arsitektur","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21831/INERSIA.V17I1.40570","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
ABSTRACT The high demand for electricity needs requires the availability of new generation sites. The new plant developed is a PLTU in Lontar. The condition of coal shelter as a research site dominated by silty clay and silty sand and located in the earthquake zoning is high that the planning of the coal shelter area must accordance with the feasibility of building establishment, it is necessary to analyze the potential liquefaction and improvement methods. Soil improvement efforts to reduce the potential for liquefaction include soil improvement with stone columns. The method of liquefaction analysis in this study uses the method developed by Idriss and Boulanger. The results of the analysis of the potential for liquefaction at BH-1 occurred at a depth of 3-16 m and at BH-3 the potential for liquefaction occurred at a depth of 4-24 m. Potential of the thickest layer for liquefaction is at BH-3 with a depth of 24 m. Improvement with a stone column can reduce the potential for liquefaction and can increase the value of the safety factor against the potential for liquefaction at the coal shelter location. Improvement analysis with a stone column using Plaxis software, the value of the safe factor after installing the stone column at BH-1 FS 2.89, at BH-3 FS became 2.65. ABSTRAKBanyaknya permintaan kebutuhan listrik yang tinggi diperlukan ketersediaan lokasi pembangkit baru. Pembangkit baru yang dikembangkan yaitu PLTU Batubara di Lontar. Kondisi coal shelter sebagai lokasi penelitian yang didominasi oleh lapisan tanah lempung kelanauan dan pasir kelanauan serta berada pada zonasi gempa cukup tinggi sehingga perencanaan area coal shelter harus memenuhi syarat kelayakan pendirian bangunan, maka perlu dilakukan analisis potensi likuefaksi serta metode perbaikannya. Upaya perbaikan tanah untuk mengurangi potensi likuefaksi yaitu perbaikan tanah dengan stone column (kolom batu). Metode analisis likuefaksi pada penelitian ini menggunakan metode yang dikembangkan oleh Idriss dan Boulanger. Hasil analisis potensi likuefaksi pada titik BH-1 terjadi di kedalaman 3-16 m dan pada titik BH-3 potensi likuefaksi terjadi pada kedalaman 4-24 m. Lapisan yang paling tebal mengalami potensi likuefaksi ada pada titik BH-3 dengan kedalaman 24 m. Perbaikan dengan stone column dapat mengurangi potensi likuefaksi dan mampu meningkatkan nilai faktor keamanan terhadap potensi likuefaksi di lokasi coal shelter. Analisis perbaikian dengan stone column menggunakan software Plaxis, nilai faktor aman setelah dipasang stone column pada titik BH-1 FS 2,89, pada titik BH-3 FS menjadi 2,65.
对电力的高需求要求有新的发电场地。新开发的工厂是位于伦敦的PLTU。煤掩体作为以粉质粘土和粉质砂为主的研究场地,地处地震带,其条件要求高,煤掩体区域的规划必须符合建筑建设的可行性,有必要对潜在的液化和改造方法进行分析。减少液化可能性的土壤改良措施包括用石柱改良土壤。本研究的液化分析方法采用了Idriss和Boulanger提出的方法。BH-1的液化潜力分析结果发生在3-16 m的深度,而BH-3的液化潜力发生在4-24 m的深度。最厚液化层的潜力位于BH-3,深度为24 m。采用石柱进行改造可以降低煤仓液化的可能性,并可以提高煤仓位置相对于液化可能性的安全系数值。用Plaxis软件对石柱进行改进分析,在BH-1 FS安装石柱后的安全系数为2.89,在BH-3 FS安装石柱后的安全系数为2.65。[摘要]杨廷吉,杨廷吉,杨廷吉,潘邦吉,潘邦吉。Pembangkit baru yang dikembangkan yitu PLTU Batubara di Lontar。Kondisi煤仓sebagai lokasi penelitian yang didominasi oleh lapisan tanah lempung kelanauan dan pasir kelanauan serta berada pada zonasi gempa cukup tinggi sehinga perencanan地区煤仓harus memenuhi syarat kelayakan pendirian bangunan, maka perlu dilakukan分析potential like faksi serta mede perbaikannya。Upaya perbaikan tanah untuk mengurangi potential like uefaksi yaitu perbaikan tanah dengan石柱(kolom batu)。方法分析,如fefaksi帕帕penelitian ini menggunakan方法,yang dikembangkan方法,oleh Idriss dan Boulanger。Hasil分析的电位似uefaksi的电位为3-16米,而似bhh -3的电位似uefaksi的电位为4-24米。Lapisan yang paling tebal mengalami potential likakaksi ada ada titik BH-3登干kedalaman 24 m。Perbaikan dengan石柱dapat mengurangi potentisi like uefaksi danmampu meningkatkan nilai faktor keamanan terhadap potentisi like uefaksi di lokasi coal shelter。分析perbaikian登干石柱孟古纳坎软件Plaxis, nilai因子aman setelah dipasang石柱padtitikh BH-1 FS 2,89, padtitikh BH-3 FS menjadi 2,65。