{"title":"Calculation and analysis of bearing capacity reliability index of post-grouting pile","authors":"Zhang Zhitong, W. Gong, Guoliang Dai","doi":"10.3208/jgssp.v08.c30","DOIUrl":null,"url":null,"abstract":"The bearing capacity of bored piles is significantly improved and the dispersion of bearing capacity is reduced obviously by employing the method of grouting. However, there is still a lack of systematic research on the calculation and analysis of the reliability index of post-grouting pile. In this paper, the static load test data of 152 non-grouted bored piles and 113 post-grouted bored piles are collected. The influence of factors such as safety factor K , types of load effect combination, and the pile diameter are taken into account. Then, the approximate probability method based on the first-order second-moment method (JC method) and Monte Carlo method is employed to analyze the reliability indexes of post-grouted bored piles and non-grouted ones.","PeriodicalId":283909,"journal":{"name":"Japanese Geotechnical Society Special Publication","volume":"48 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-03-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Japanese Geotechnical Society Special Publication","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3208/jgssp.v08.c30","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The bearing capacity of bored piles is significantly improved and the dispersion of bearing capacity is reduced obviously by employing the method of grouting. However, there is still a lack of systematic research on the calculation and analysis of the reliability index of post-grouting pile. In this paper, the static load test data of 152 non-grouted bored piles and 113 post-grouted bored piles are collected. The influence of factors such as safety factor K , types of load effect combination, and the pile diameter are taken into account. Then, the approximate probability method based on the first-order second-moment method (JC method) and Monte Carlo method is employed to analyze the reliability indexes of post-grouted bored piles and non-grouted ones.