MIBEL and the Market Splitting - 5th International Conference on the European electricity market

J. Borges
{"title":"MIBEL and the Market Splitting - 5th International Conference on the European electricity market","authors":"J. Borges","doi":"10.1109/EEM.2008.4579105","DOIUrl":null,"url":null,"abstract":"The purpose of this paper is to evaluate the MIBEL (Iberian electricity market) prices and the interconnection capacity between Portugal and Spain during the first five month of Iberian market. With the formal beginning of MIBEL on 1 of July 2007, it becomes possible for any consumer in the Iberian zone to acquire electrical energy under a free competition regime, from any producer or retailer that acts in Portugal or Spain. But in this few month of MIBEL, has the price decreased? The hourly prices in Portugal and Spain are different for the most part of the days, due to market splitting. So what should be the interconnection capacity between this two countries for that the Iberian Peninsula have only one price? This paper shows the results of two scenarios simulations: the Iberian Market and a market splitting scenario (two distinct markets), in the form of prices and interconnection energy exchanges, for the analysis period of 5 months starting in July and ending in November 2007.","PeriodicalId":118618,"journal":{"name":"2008 5th International Conference on the European Electricity Market","volume":"127 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 5th International Conference on the European Electricity Market","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2008.4579105","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

Abstract

The purpose of this paper is to evaluate the MIBEL (Iberian electricity market) prices and the interconnection capacity between Portugal and Spain during the first five month of Iberian market. With the formal beginning of MIBEL on 1 of July 2007, it becomes possible for any consumer in the Iberian zone to acquire electrical energy under a free competition regime, from any producer or retailer that acts in Portugal or Spain. But in this few month of MIBEL, has the price decreased? The hourly prices in Portugal and Spain are different for the most part of the days, due to market splitting. So what should be the interconnection capacity between this two countries for that the Iberian Peninsula have only one price? This paper shows the results of two scenarios simulations: the Iberian Market and a market splitting scenario (two distinct markets), in the form of prices and interconnection energy exchanges, for the analysis period of 5 months starting in July and ending in November 2007.
MIBEL与市场分裂-第五届欧洲电力市场国际会议
本文的目的是评估伊比利亚电力市场前五个月的价格和葡萄牙和西班牙之间的互联容量。随着2007年7月1日MIBEL的正式启动,伊比利亚地区的任何消费者都可以在自由竞争制度下从葡萄牙或西班牙的任何生产商或零售商那里获得电能。但是在MIBEL的这几个月里,价格下降了吗?由于市场分裂,葡萄牙和西班牙的小时价格在大部分时间里是不同的。那么,在伊比利亚半岛只有一个价格的情况下,这两个国家之间的互联容量应该是多少呢?本文展示了两种情景模拟的结果:伊比利亚市场和市场分裂情景(两个不同的市场),以价格和互联能源交易所的形式,分析期为5个月,从2007年7月开始到11月结束。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信