Factors Affecting Construction Productivity for Steel Rebar Work in Hot Climate Country

Mohammed Aldahash, O. Alshamrani
{"title":"Factors Affecting Construction Productivity for Steel Rebar Work in Hot Climate Country","authors":"Mohammed Aldahash, O. Alshamrani","doi":"10.2174/18748368-v16-e2206272","DOIUrl":null,"url":null,"abstract":"Construction industry is increasingly emphasizing productivity due to its effect on key performance indicators such as schedule, budget, and quality of work. This study aims to identify and rank the factors affecting the productivity of steel rebar work in construction projects in a hot climate. Among the activities involved in structural reinforced concrete work, fabricating and placing reinforced steel on a construction site is considered the most labor-intensive, outdoor, and time-consuming. In this paper, an intensive qualitative literature review is conducted to identify the factors affecting the productivity of steel rebar work in concrete construction. Initially, forty factors were identified from the literature affecting the productivity of steel rebar work in Saudi Arabia. Final list of thirty-seven factors was used in the questionnaire survey. The identical nature and core content of these factors are clustered and grouped into five categories: technical, labor, management, external, and financial. As part of this study, fifty contractors working in the Saudi Arabian construction industry are recruited to participate and complete a structured pilot study questionnaire. The results of the questionnaire are weighted using the pairwise comparison method and then ranked based on the Analytic Hierarchy Process technique. The analysis of the thirty-seven factors results in a top ten list of the leading factors that directly impact the productivity of steel rebar work in concrete construction projects in Saudi Arabia. These factors are (1) humidity, (2) delay of salary, (3) sandstorms, (4) payment delay by client, (5) labor's low wage, (6) lack of financial incentives, (7) labor work experience and skills, (8) completeness of drawings, (9) poor labor relations, and (10) labor absenteeism. The general trend in these studies is that the factors tend to vary from jurisdiction to jurisdiction, from one construction project to another, and are directly related to the zone or country of construction. These findings benefit stakeholders working in the concrete construction industry in Saudi Arabia, particularly project managers, project planners, cost estimators, and civil design and site engineers working on construction projects.","PeriodicalId":272529,"journal":{"name":"The Open Construction & Building Technology Journal","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Open Construction & Building Technology Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2174/18748368-v16-e2206272","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Construction industry is increasingly emphasizing productivity due to its effect on key performance indicators such as schedule, budget, and quality of work. This study aims to identify and rank the factors affecting the productivity of steel rebar work in construction projects in a hot climate. Among the activities involved in structural reinforced concrete work, fabricating and placing reinforced steel on a construction site is considered the most labor-intensive, outdoor, and time-consuming. In this paper, an intensive qualitative literature review is conducted to identify the factors affecting the productivity of steel rebar work in concrete construction. Initially, forty factors were identified from the literature affecting the productivity of steel rebar work in Saudi Arabia. Final list of thirty-seven factors was used in the questionnaire survey. The identical nature and core content of these factors are clustered and grouped into five categories: technical, labor, management, external, and financial. As part of this study, fifty contractors working in the Saudi Arabian construction industry are recruited to participate and complete a structured pilot study questionnaire. The results of the questionnaire are weighted using the pairwise comparison method and then ranked based on the Analytic Hierarchy Process technique. The analysis of the thirty-seven factors results in a top ten list of the leading factors that directly impact the productivity of steel rebar work in concrete construction projects in Saudi Arabia. These factors are (1) humidity, (2) delay of salary, (3) sandstorms, (4) payment delay by client, (5) labor's low wage, (6) lack of financial incentives, (7) labor work experience and skills, (8) completeness of drawings, (9) poor labor relations, and (10) labor absenteeism. The general trend in these studies is that the factors tend to vary from jurisdiction to jurisdiction, from one construction project to another, and are directly related to the zone or country of construction. These findings benefit stakeholders working in the concrete construction industry in Saudi Arabia, particularly project managers, project planners, cost estimators, and civil design and site engineers working on construction projects.
影响炎热气候国家钢筋施工生产率的因素
建设行业越来越重视生产力,因为它对进度、预算、工作质量等关键绩效指标有影响。本研究的目的是识别和排序的因素,影响生产力的钢筋工作在建设项目在炎热的气候。在结构钢筋混凝土工程中,在施工现场制造和放置钢筋被认为是最劳动密集、户外和耗时的。本文进行了密集的定性文献综述,以确定影响混凝土施工中钢筋工作生产率的因素。最初,从文献中确定了影响沙特阿拉伯钢筋工作生产率的40个因素。在问卷调查中使用了37个因素的最终列表。这些因素的相同性质和核心内容被聚集和分组为五类:技术,劳动力,管理,外部和财务。作为本研究的一部分,沙特阿拉伯建筑业的50名承包商被招募参与并完成一份结构化的试点研究问卷。采用两两比较法对问卷结果进行加权,然后采用层次分析法对问卷结果进行排序。对37个因素的分析得出了直接影响沙特阿拉伯混凝土建筑项目中钢筋工作生产率的十大主要因素。这些因素是(1)湿度,(2)延迟发工资,(3)沙尘暴,(4)客户延迟付款,(5)劳工工资低,(6)缺乏财政激励,(7)劳工工作经验和技能,(8)图纸完整,(9)劳资关系差,(10)劳工缺勤。这些研究的总体趋势是,不同的司法管辖区、不同的建设项目往往会有不同的因素,并且与建设的区域或国家直接相关。这些发现有利于沙特阿拉伯混凝土建筑行业的利益相关者,特别是项目经理、项目规划人员、成本估算人员以及从事建筑项目的土木设计和现场工程师。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信