A multi-objective lead time control problem based on the failure rate of products

He Zhen, Zhang Meng, Liang Zhao-lei, Liu Yafen
{"title":"A multi-objective lead time control problem based on the failure rate of products","authors":"He Zhen, Zhang Meng, Liang Zhao-lei, Liu Yafen","doi":"10.1109/ICIEA.2008.4582500","DOIUrl":null,"url":null,"abstract":"In this paper, we develop a multi-objective model to optimally control the lead time of a manufacturing system, using goal attainment method. The manufacturing system is modelled as a new queueing system based on the failure rate of products, in which the products may have quality problems and need to be repaired in each service station. It is assumed that the product order arrives according to a Poisson process. In each service station, there is only one server (machines) with exponentially distributed processing time, in which the service rate (capacity) is controllable. The maintenance time of manufacturing and assembly operations is exponentially distributed. By using the total probability decomposition and Markov process method, the Queue Length Distribution, the recursion expression of the equilibrium distribution and the mean waiting time are obtained. Then, we develop a multi-objective optimal control problem, in which the average lead time, the maintenance costs and the operating costs of the system per period are minimized using goal attainment method.","PeriodicalId":309894,"journal":{"name":"2008 3rd IEEE Conference on Industrial Electronics and Applications","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-06-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 3rd IEEE Conference on Industrial Electronics and Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIEA.2008.4582500","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In this paper, we develop a multi-objective model to optimally control the lead time of a manufacturing system, using goal attainment method. The manufacturing system is modelled as a new queueing system based on the failure rate of products, in which the products may have quality problems and need to be repaired in each service station. It is assumed that the product order arrives according to a Poisson process. In each service station, there is only one server (machines) with exponentially distributed processing time, in which the service rate (capacity) is controllable. The maintenance time of manufacturing and assembly operations is exponentially distributed. By using the total probability decomposition and Markov process method, the Queue Length Distribution, the recursion expression of the equilibrium distribution and the mean waiting time are obtained. Then, we develop a multi-objective optimal control problem, in which the average lead time, the maintenance costs and the operating costs of the system per period are minimized using goal attainment method.
基于产品故障率的多目标交货期控制问题
本文采用目标达成法,建立了制造系统交货期优化控制的多目标模型。将制造系统建模为基于产品故障率的新型排队系统,其中产品可能存在质量问题,需要在每个服务站进行维修。假设产品订单按照泊松过程到达。每个服务站只有一台服务器(机),处理时间呈指数分布,服务率(容量)可控。制造和装配作业的维护时间呈指数分布。利用全概率分解和马尔可夫过程方法,得到了排队长度分布、均衡分布的递归表达式和平均等待时间。在此基础上,利用目标实现方法,建立了系统周期内平均交货期、维护费用和运行费用最小的多目标最优控制问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信