{"title":"Study of operating modes of crane-drilling machines in thawed soils","authors":"S. Orlovsky, S. Voynash, V. Sokolova, Yu.I. Belenky, A. Krivonogova","doi":"10.47813/rosnio-ii.2023.8.127-133","DOIUrl":null,"url":null,"abstract":"The article deals with the problem of using crane-boring machines in the construction of communication lines and power transmission lines, the installation of fence posts and road signs, as well as in the construction of reclamation facilities. The data of experimental studies of these machines in the field to determine the rational modes of their operation in thawed soils are given. As a result of the research, it was found that the analysis of previous studies of the drilling modes of thawed soils does not give a clear idea of the existence and location on the response surface of the area of optimum drilling speed, taken as an optimization parameter. The necessity of researches is emphasized from the description of the area of the response surface by the polynomial of the first degree with the subsequent movement along its surface in the direction of the gradient of the linear approximation. The data of the results of experiments when drilling compacted loam with a drilling tool are given. It is concluded that it is more expedient to drill thawed soils at high rotational frequencies of the drilling tool and feed forces in the range of 1200 – 1700 kgf. The increased rotational speed of the drilling tool also provides the best conditions for transporting destroyed soil from the bottom of wells","PeriodicalId":298635,"journal":{"name":"II All-Russian (national) scientific conference with international participation \"Russian Science, Innovation, Education\"","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"II All-Russian (national) scientific conference with international participation \"Russian Science, Innovation, Education\"","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47813/rosnio-ii.2023.8.127-133","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The article deals with the problem of using crane-boring machines in the construction of communication lines and power transmission lines, the installation of fence posts and road signs, as well as in the construction of reclamation facilities. The data of experimental studies of these machines in the field to determine the rational modes of their operation in thawed soils are given. As a result of the research, it was found that the analysis of previous studies of the drilling modes of thawed soils does not give a clear idea of the existence and location on the response surface of the area of optimum drilling speed, taken as an optimization parameter. The necessity of researches is emphasized from the description of the area of the response surface by the polynomial of the first degree with the subsequent movement along its surface in the direction of the gradient of the linear approximation. The data of the results of experiments when drilling compacted loam with a drilling tool are given. It is concluded that it is more expedient to drill thawed soils at high rotational frequencies of the drilling tool and feed forces in the range of 1200 – 1700 kgf. The increased rotational speed of the drilling tool also provides the best conditions for transporting destroyed soil from the bottom of wells
解冻土壤中起重钻机工作模式的研究
本文论述了起重机掘进机在通信线路、输电线路的施工、栅栏柱、道路标志的安装以及填海设施的施工中所存在的问题。为确定这些机器在解冻土壤中的合理工作模式,给出了这些机器在现场的试验研究数据。研究发现,以往对解冻土壤钻孔方式的研究分析,并没有明确以最佳钻孔速度为优化参数的区域在响应面上的存在和位置。从一次多项式对响应面面积的描述及其后续沿线性逼近梯度方向的运动出发,强调了研究的必要性。给出了用钻具钻实壤土的试验结果数据。结果表明,在钻头旋转频率高、进给力在1200 ~ 1700 kgf范围内的情况下,对解冻土壤进行钻孔更为有利。钻井工具转速的提高也为从井底输送被破坏的土壤提供了最佳条件
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信