{"title":"AutoSACE-automatic checkout for Poseidon","authors":"G. W. Schultz, J. M. Colebank","doi":"10.1145/1465611.1465699","DOIUrl":null,"url":null,"abstract":"A major difficulty encountered in the manufacture of complex systems is the insurance of specification compliance of sub-assemblies at numerous points in the manufacturing process. An additional problem is encountered when historical data concerning any particular specification failure is required.","PeriodicalId":265740,"journal":{"name":"AFIPS '67 (Fall)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1967-11-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"AFIPS '67 (Fall)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/1465611.1465699","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
A major difficulty encountered in the manufacture of complex systems is the insurance of specification compliance of sub-assemblies at numerous points in the manufacturing process. An additional problem is encountered when historical data concerning any particular specification failure is required.