PEMANFAATAN WADUK BENING/ WIDAS SEBAGAI LOKASI PEMBANGKIT LISTRIK TENAGA SURYA (PLTS)

Herwangga Satria Permana, Rintis Hadiani, S. Solichin
{"title":"PEMANFAATAN WADUK BENING/ WIDAS SEBAGAI LOKASI PEMBANGKIT LISTRIK TENAGA SURYA (PLTS)","authors":"Herwangga Satria Permana, Rintis Hadiani, S. Solichin","doi":"10.20961/JRRS.V2I2.28630","DOIUrl":null,"url":null,"abstract":"Electricity is a basic requirement in carrying out activities. However, over time, the electricity needs to increase but the availability of electricity is still stagnant. So that the necessary innovation of electricity generation. Solar power plants (PLTS) can be a solution to this problem. PLTS tends to require extensive land, therefore the idea of utilizing the reservoir as a PLTS location. In this penelitin selected Reservoir Bening / Widas as PLTS location. The calculation of the extent of the permit puddle needs to be done to find out how much PLTS design can be built. Furthermore, it is necessary to calculate the energy generated as well as economic feasibility analysis. The results of this study indicate that the area of permit inundation in the Bening / Widas Reservoir is 944893 m2 and PLTS which can be built as many as 20 modules with a design area of 1 module PLTS is 8000 m². The energy produced by 20 PLTS modules within 1 year is 19668.52 MWh. ","PeriodicalId":448424,"journal":{"name":"Jurnal Riset Rekayasa Sipil","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-03-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Riset Rekayasa Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.20961/JRRS.V2I2.28630","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Electricity is a basic requirement in carrying out activities. However, over time, the electricity needs to increase but the availability of electricity is still stagnant. So that the necessary innovation of electricity generation. Solar power plants (PLTS) can be a solution to this problem. PLTS tends to require extensive land, therefore the idea of utilizing the reservoir as a PLTS location. In this penelitin selected Reservoir Bening / Widas as PLTS location. The calculation of the extent of the permit puddle needs to be done to find out how much PLTS design can be built. Furthermore, it is necessary to calculate the energy generated as well as economic feasibility analysis. The results of this study indicate that the area of permit inundation in the Bening / Widas Reservoir is 944893 m2 and PLTS which can be built as many as 20 modules with a design area of 1 module PLTS is 8000 m². The energy produced by 20 PLTS modules within 1 year is 19668.52 MWh. 
用于太阳能发电厂的清水库/ WIDAS
电是开展活动的基本要求。然而,随着时间的推移,电力需求增加,但电力供应仍然停滞不前。这样就有必要创新发电。太阳能发电厂(PLTS)可以解决这个问题。PLTS往往需要广泛的土地,因此利用水库作为PLTS位置的想法。在本研究中,penelitin选择了北京/ Widas水库作为PLTS的位置。需要对许可水坑的范围进行计算,以确定可以建造多少PLTS设计。此外,还需要进行发电量的计算和经济可行性分析。研究结果表明,京威达水库的许可淹没面积为944893 m2,可建设的PLTS模块数为20个,设计面积为1个模块的PLTS为8000 m²。20个PLTS模块1年发电量为19668.52兆瓦时。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书