Feasibility and Challenges of the Demand Side Management Implementation in Pakistan

U. Rehman
{"title":"Feasibility and Challenges of the Demand Side Management Implementation in Pakistan","authors":"U. Rehman","doi":"10.1109/ICET.2018.8603559","DOIUrl":null,"url":null,"abstract":"The demand side management (DSM) is a special technique to modify the power network to achieve the diverse and enhanced performance. The basic objective of DSM is to motivate the power consumers to minimize the electricity use in peak hours, or to divert the power consumption during the off-peak hours. The main hurdle between the DSM implementation in Pakistan is the unavailability of power dispatch profile in real time, due to absence of smart metering devices. Even the present power grid infrastructure in Pakistan does not have sophisticated monitoring devices. This paper consists of a detailed study of the present power grid profile of Pakistan and highlights the challenges which are the main obstacles between the implementation of DSM and smart grid in the present power network. Moreover, the latest technologies have been explored which can help to minimize the complications of the present power network of Pakistan.","PeriodicalId":443353,"journal":{"name":"2018 14th International Conference on Emerging Technologies (ICET)","volume":"60 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 14th International Conference on Emerging Technologies (ICET)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICET.2018.8603559","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

The demand side management (DSM) is a special technique to modify the power network to achieve the diverse and enhanced performance. The basic objective of DSM is to motivate the power consumers to minimize the electricity use in peak hours, or to divert the power consumption during the off-peak hours. The main hurdle between the DSM implementation in Pakistan is the unavailability of power dispatch profile in real time, due to absence of smart metering devices. Even the present power grid infrastructure in Pakistan does not have sophisticated monitoring devices. This paper consists of a detailed study of the present power grid profile of Pakistan and highlights the challenges which are the main obstacles between the implementation of DSM and smart grid in the present power network. Moreover, the latest technologies have been explored which can help to minimize the complications of the present power network of Pakistan.
巴基斯坦需求侧管理实施的可行性与挑战
需求侧管理(DSM)是对电网进行改造以实现多样化和增强型性能的一种特殊技术。用电需求管理的基本目标是促使电力用户尽量减少高峰时段的用电量,或在非高峰时段转移用电量。由于缺乏智能计量设备,巴基斯坦实施DSM的主要障碍是无法实时获得电力调度配置文件。即使巴基斯坦目前的电网基础设施也没有复杂的监测设备。本文对巴基斯坦目前的电网概况进行了详细的研究,并强调了在目前的电网中实施DSM和智能电网之间的主要障碍。此外,已经探索了有助于尽量减少巴基斯坦现有电网复杂性的最新技术。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信