Reclassification of askarel transformers-field application and results

M. D. McMahon, B. Rian
{"title":"Reclassification of askarel transformers-field application and results","authors":"M. D. McMahon, B. Rian","doi":"10.1109/CITCON.1988.13237","DOIUrl":null,"url":null,"abstract":"Several field-proven processes are now available by which pure askarel (PCB) transformers may be reconditioned with guaranteed reclassification to non-PCB status of less than 50 p.p.m. One such proprietary procedure, introduced by Westinghouse, by which more than 60 commercially owned transformers have been reclassified at very low PCB levels following a few months of processing and 90 days of in-service waiting period, is discussed. The process, the extensive test program, and actual case history results are discussed.<<ETX>>","PeriodicalId":118848,"journal":{"name":"30th IEEE Cement Industry Technical Conference","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"30th IEEE Cement Industry Technical Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CITCON.1988.13237","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Several field-proven processes are now available by which pure askarel (PCB) transformers may be reconditioned with guaranteed reclassification to non-PCB status of less than 50 p.p.m. One such proprietary procedure, introduced by Westinghouse, by which more than 60 commercially owned transformers have been reclassified at very low PCB levels following a few months of processing and 90 days of in-service waiting period, is discussed. The process, the extensive test program, and actual case history results are discussed.<>
askarel变压器的重新分类——现场应用与结果
目前已有几种现场验证的工艺,可以对纯askarel (PCB)变压器进行修复,并保证将其重新分类为非PCB状态,时间少于50 p.m。本文讨论了西屋电气(Westinghouse)引入的一种专有工艺,通过该工艺,60多台商用变压器在经过几个月的处理和90天的使用等待期后,已将其重新分类为非常低的PCB水平。讨论了过程、广泛的测试程序和实际的案例历史结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信