Carlos Bajo Pavía, Luis Martín-Tereso López, José Vicente Candel Hernandis, W. Włodzimirski, Božena Morávková, Ivan Vöröš, Adrián Chalupec, Juraj Kopčák, J. Simón-Talero, Ángel Carriazo, R. Merino, J. Stráský, P. Novotný
{"title":"D4R7. New Danube Crossing at Bratislava","authors":"Carlos Bajo Pavía, Luis Martín-Tereso López, José Vicente Candel Hernandis, W. Włodzimirski, Božena Morávková, Ivan Vöröš, Adrián Chalupec, Juraj Kopčák, J. Simón-Talero, Ángel Carriazo, R. Merino, J. Stráský, P. Novotný","doi":"10.2749/prague.2022.1527","DOIUrl":null,"url":null,"abstract":"Bratislava Bypass project – D4R7 comprises D4 Highway with a length of 27 km and R7 Expressway with a length of 32 km. It was established as a Public-Private Partnership including design, construction, financing, operation, and maintenance. More than 100 concrete and steel bridges were executed within the project with different typologies, box-girder, beam bridges, post- tensioned slabs and culverts, ecoducts, cyclist and pedestrian bridges, as well as refurbishment of several structures in one of the major interchanges in Bratislava – Prievoz.The most significant part of the D4R7 project is the 6th crossing over the river Danube, its floodplain, and adjacent area in Bratislava including the environmentally protected area of Natura 2000. It consists of a 3 km long highway elevated on the bridges and viaducts.","PeriodicalId":168532,"journal":{"name":"IABSE Symposium, Prague 2022: Challenges for Existing and Oncoming Structures","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IABSE Symposium, Prague 2022: Challenges for Existing and Oncoming Structures","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2749/prague.2022.1527","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Bratislava Bypass project – D4R7 comprises D4 Highway with a length of 27 km and R7 Expressway with a length of 32 km. It was established as a Public-Private Partnership including design, construction, financing, operation, and maintenance. More than 100 concrete and steel bridges were executed within the project with different typologies, box-girder, beam bridges, post- tensioned slabs and culverts, ecoducts, cyclist and pedestrian bridges, as well as refurbishment of several structures in one of the major interchanges in Bratislava – Prievoz.The most significant part of the D4R7 project is the 6th crossing over the river Danube, its floodplain, and adjacent area in Bratislava including the environmentally protected area of Natura 2000. It consists of a 3 km long highway elevated on the bridges and viaducts.