Long-termed investment planning model for a generation company operating in both bilateral contract and day-ahead markets

Berna Tektas Sivrikaya, F. Çebi
{"title":"Long-termed investment planning model for a generation company operating in both bilateral contract and day-ahead markets","authors":"Berna Tektas Sivrikaya, F. Çebi","doi":"10.1504/IJIDS.2016.075789","DOIUrl":null,"url":null,"abstract":"This paper presents a modelling framework for generation capacity expansion planning (GEP) applicable to independent investor generation companies (GenCos) in the context of a hybrid electricity wholesale market. The proposed model is novel in the sense that the operations of the GenCo in bilateral contracts market (BCM) and day-ahead market (DAM) are incorporated. Also, the environmental considerations are modelled through the incorporation of carbon tax and carbon dioxide (CO2) cap regulations. At the end of existing generation units' useful life, refurbishment decisions are employed. In this way, conversion of old units to units with lower operation costs and/or green house gases emissions is modelled. The effect of uncertainties in electricity market prices, fuel costs, environmental regulations, budget, and the effect of the GenCos long-termed strategic behaviour in participating in BCM and DAM on the planning decisions are illustrated by sensitivity analysis.","PeriodicalId":303039,"journal":{"name":"Int. J. Inf. Decis. Sci.","volume":"40 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-04-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Int. J. Inf. Decis. Sci.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJIDS.2016.075789","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

This paper presents a modelling framework for generation capacity expansion planning (GEP) applicable to independent investor generation companies (GenCos) in the context of a hybrid electricity wholesale market. The proposed model is novel in the sense that the operations of the GenCo in bilateral contracts market (BCM) and day-ahead market (DAM) are incorporated. Also, the environmental considerations are modelled through the incorporation of carbon tax and carbon dioxide (CO2) cap regulations. At the end of existing generation units' useful life, refurbishment decisions are employed. In this way, conversion of old units to units with lower operation costs and/or green house gases emissions is modelled. The effect of uncertainties in electricity market prices, fuel costs, environmental regulations, budget, and the effect of the GenCos long-termed strategic behaviour in participating in BCM and DAM on the planning decisions are illustrated by sensitivity analysis.
在双边合同和日前市场中运营的发电公司的长期投资规划模型
本文提出了一个适用于混合电力批发市场背景下独立投资者发电公司(GenCos)的发电容量扩展规划(GEP)建模框架。所提出的模型是新颖的,因为它将GenCo在双边合同市场(BCM)和日前市场(DAM)中的操作合并在一起。此外,通过碳税和二氧化碳(CO2)上限法规的合并,对环境因素进行了建模。在现有发电机组的使用寿命结束时,采用翻新决策。通过这种方式,模拟了将旧机组转换为运行成本和/或温室气体排放较低的机组的过程。通过敏感性分析说明了电力市场价格、燃料成本、环境法规、预算的不确定性以及发电公司参与BCM和DAM的长期战略行为对规划决策的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信