{"title":"Scheduling jobs with machine-dependent processing times","authors":"Yi-Feng Hung, Jui-ling Yang","doi":"10.1109/IEMT.1996.559680","DOIUrl":null,"url":null,"abstract":"In semiconductor manufacturing, the rapid development of manufacturing equipment allows product processing to be achieved by machines of different generations whose processing speed may be different. In this study, we propose several heuristics to schedule independent jobs on machines with different processing speeds. The scope of this research is limited to a static and deterministic problem. The scheduling objective is to minimize two due-date-related criteria: total lateness and total tardiness, respectively.","PeriodicalId":177653,"journal":{"name":"Nineteenth IEEE/CPMT International Electronics Manufacturing Technology Symposium","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1996-10-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nineteenth IEEE/CPMT International Electronics Manufacturing Technology Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEMT.1996.559680","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In semiconductor manufacturing, the rapid development of manufacturing equipment allows product processing to be achieved by machines of different generations whose processing speed may be different. In this study, we propose several heuristics to schedule independent jobs on machines with different processing speeds. The scope of this research is limited to a static and deterministic problem. The scheduling objective is to minimize two due-date-related criteria: total lateness and total tardiness, respectively.