{"title":"Simulation-based approach to design a multi-stage flow-shop in steel works","authors":"N. Ueno, S. Sotojima, J. Takeda","doi":"10.1145/106073.306884","DOIUrl":null,"url":null,"abstract":"This paper describes a new simulation-based approach for redesign of a multi-stage flow-shop production line. A performance measure which represents an 'actual' production rate of a machine is defined in order to identify bottlenecks. A simulation procedure based on the proposed measure is developed in order to determine how best to alleviate the bottlenecks. This new approach is applied for redesigning an actual large-scale multi-stage flow-shop production line in the authors' steelworks and they can determine the proper specifications of this line which can achieve an increase of productivity with a minimal investment. This approach is practical and powerful for redesign of a multi-stage flow-shop production line. >","PeriodicalId":186490,"journal":{"name":"Annual Simulation Symposium","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1991-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Annual Simulation Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/106073.306884","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4
Abstract
This paper describes a new simulation-based approach for redesign of a multi-stage flow-shop production line. A performance measure which represents an 'actual' production rate of a machine is defined in order to identify bottlenecks. A simulation procedure based on the proposed measure is developed in order to determine how best to alleviate the bottlenecks. This new approach is applied for redesigning an actual large-scale multi-stage flow-shop production line in the authors' steelworks and they can determine the proper specifications of this line which can achieve an increase of productivity with a minimal investment. This approach is practical and powerful for redesign of a multi-stage flow-shop production line. >