Simulated power system restoration

O. Samuelsson, L. Lindgren
{"title":"Simulated power system restoration","authors":"O. Samuelsson, L. Lindgren","doi":"10.1109/UPEC.2008.4651473","DOIUrl":null,"url":null,"abstract":"Outage time after extensive blackouts depends very much on the power system restoration process. Power system restoration is a very challenging task to the operator since the situation is so far from normal conditions. This paper proposes a simulation-based tool that determines a feasible sequence of operator actions that restores power system operation. The effect of each candidate switching operation or setpoint change is evaluated mainly in terms of restored load and the predicted steady state voltage and frequency. Application to the CIGRE NORDIC32 test system shows that operation is fully restored from complete blackout after about 750 actions including network switching and gradual connection of system loads. The main applications of the methodology are off-line use for surveying new restoration strategies and on-line use for suggesting the next action to the operator.","PeriodicalId":287461,"journal":{"name":"2008 43rd International Universities Power Engineering Conference","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-12-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 43rd International Universities Power Engineering Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/UPEC.2008.4651473","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Outage time after extensive blackouts depends very much on the power system restoration process. Power system restoration is a very challenging task to the operator since the situation is so far from normal conditions. This paper proposes a simulation-based tool that determines a feasible sequence of operator actions that restores power system operation. The effect of each candidate switching operation or setpoint change is evaluated mainly in terms of restored load and the predicted steady state voltage and frequency. Application to the CIGRE NORDIC32 test system shows that operation is fully restored from complete blackout after about 750 actions including network switching and gradual connection of system loads. The main applications of the methodology are off-line use for surveying new restoration strategies and on-line use for suggesting the next action to the operator.
模拟电力系统恢复
大面积停电后的停电时间在很大程度上取决于电力系统的恢复过程。由于情况与正常情况相差甚远,电力系统的恢复对运营商来说是一项非常具有挑战性的任务。本文提出了一种基于仿真的工具来确定一个可行的操作员动作序列,以恢复电力系统的运行。每个候选开关操作或设定值变化的影响主要根据恢复的负载和预测的稳态电压和频率来评估。在CIGRE NORDIC32测试系统上的应用表明,经过750个动作,包括网络切换和系统负载的逐渐连接,完全停电后完全恢复运行。该方法的主要应用是离线用于调查新的修复策略,在线用于向运营商建议下一步行动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信