How to Ensure the Quality of Construction Works for Marine Platforms with Reference to Midia Gas Development Project - ANA Platform & Doina Well & Gas Treatment Plant -

R. Schiau
{"title":"How to Ensure the Quality of Construction Works for Marine Platforms with Reference to Midia Gas Development Project - ANA Platform & Doina Well & Gas Treatment Plant -","authors":"R. Schiau","doi":"10.2478/ouacsce-2021-0020","DOIUrl":null,"url":null,"abstract":"Abstract The Midia Gas Development Project is a new offshore gas project which has been developed and built in the last 30 year in the maritime territory of Romania. Once completed, it will have the ability to cover around 10% of gas needs of Romanian population. Currently there is about 10 Bcm of resources to be produced at a rate of about 1 Bcm per annum. The infrastructure was thought to be used for the production of gas from the reservoirs of Ana and Doina, in the first place. But the long term vision of the project consists in converting the already existent infrastructure to develop green energy projects, such an offshore wind plant, solar panels fields or production of hydrogen, projects that may start time before decommissioning of the gas production platform.","PeriodicalId":345086,"journal":{"name":"Ovidius University Annals of Constanta - Series Civil Engineering","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ovidius University Annals of Constanta - Series Civil Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/ouacsce-2021-0020","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract The Midia Gas Development Project is a new offshore gas project which has been developed and built in the last 30 year in the maritime territory of Romania. Once completed, it will have the ability to cover around 10% of gas needs of Romanian population. Currently there is about 10 Bcm of resources to be produced at a rate of about 1 Bcm per annum. The infrastructure was thought to be used for the production of gas from the reservoirs of Ana and Doina, in the first place. But the long term vision of the project consists in converting the already existent infrastructure to develop green energy projects, such an offshore wind plant, solar panels fields or production of hydrogen, projects that may start time before decommissioning of the gas production platform.
参考Midia天然气开发项目——ANA平台和Doina井气处理厂——如何确保海上平台施工质量
Midia天然气开发项目是一个新的海上天然气项目,在过去的30年里,在罗马尼亚的海洋领土上开发和建造。一旦建成,它将有能力满足罗马尼亚人口约10%的天然气需求。目前有大约100亿立方米的资源将以每年约10亿立方米的速度开采。该基础设施最初被认为是用于从Ana和Doina的储层生产天然气。但该项目的长期愿景是将现有的基础设施改造为开发绿色能源项目,如海上风力发电厂、太阳能电池板油田或氢气生产,这些项目可能在天然气生产平台退役之前开始。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信