{"title":"Design for a highly efficient distributed power supply system based on reliability analysis","authors":"K. Yotsumoto, S. Muroyama, S. Matsumura, H. Watanabe","doi":"10.1109/INTLEC.1988.22406","DOIUrl":null,"url":null,"abstract":"A distributed power supply system with highly efficient characteristics is being developed to replace conventional centralized power systems. In this system, as in conventional power systems, a standby energy system composed of batteries and engine-generator sets is used as a back-up system for the commercial power lines. However, the distributed power system, except for the engine-generator set, is installed in the telecommunications room. Thus, the floor load limitation is an important design factor. Reliability analyses show that the distributed power system should be designed using a fully duplicated engine-generator set; with battery reserve time reduced to one-sixth that of conventional centralized power systems; and with transfer switch unavailability designed to be less than 5*10/sup -7/.<<ETX>>","PeriodicalId":169486,"journal":{"name":"10th International Telecommunications Energy Conference","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1988-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"18","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"10th International Telecommunications Energy Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INTLEC.1988.22406","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 18

Abstract

A distributed power supply system with highly efficient characteristics is being developed to replace conventional centralized power systems. In this system, as in conventional power systems, a standby energy system composed of batteries and engine-generator sets is used as a back-up system for the commercial power lines. However, the distributed power system, except for the engine-generator set, is installed in the telecommunications room. Thus, the floor load limitation is an important design factor. Reliability analyses show that the distributed power system should be designed using a fully duplicated engine-generator set; with battery reserve time reduced to one-sixth that of conventional centralized power systems; and with transfer switch unavailability designed to be less than 5*10/sup -7/.<>
基于可靠性分析的高效分布式供电系统设计
一种高效的分布式供电系统正在发展,以取代传统的集中式供电系统。在这个系统中,与传统的电力系统一样,由电池和发动机发电机组组成的备用能源系统被用作商业电力线的备用系统。但是,除发电机组外,分布式电力系统均安装在电信机房内。因此,楼板荷载限制是一个重要的设计因素。可靠性分析表明,分布式电力系统应采用完全复制的机-发电机组设计;电池储备时间缩短至传统集中式电力系统的六分之一;带转换开关的不可用性设计为小于5*10/sup -7/ >
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信